# Current construction sites
**Source**: https://www.tuwien.at/en/studies/teaching-at-tu-wien/strategic-education-development-center/central-room-management-for-teaching-and-learning/information-about-construction-sites
**Parent**: https://www.tuwien.at/en/studies/teaching-at-tu-wien
### Design of the outdoor area Getreidemarkt
Design of the outdoor area between BF and BC from 1.5.25
### Window replacement/facade renovation EA Institute building Argentinierstrasse from spring 2026
Expected duration: until spring 2027
### Roof renovation AH wing KP during summer vacation 2026
### Façade renovation, window replacement Karlsplatz AE Karlsgasse/Paniglgasse wing 2027
Notice - exact dates have not yet been determined
### Renovation of cold water pipes Karlsplatz during summer vacation 2026/2027/2028
Notice – exact dates have not yet been determine
Together with the companies carrying out the work and in consultation with the central teaching and learning room management, GUT is endeavoring to keep the noise impact on teaching caused by the construction sites as low as possible. Should your course nevertheless be affected by construction site noise, please contact the central teaching support team. Hoteline DW 40040 or email: [zslti@tuwien.ac.at](# "zentraler Support für die Lehre")