Metadata
Title
CER
Category
undergraduate
UUID
9b246a929ce74be4b7c578f73d7c198d
Source URL
https://cer.iitk.ac.in/blog
Parent URL
https://cer.iitk.ac.in/
Crawl Time
2026-03-18T08:18:12+00:00
Rendered Raw Markdown

CER

Source: https://cer.iitk.ac.in/blog Parent: https://cer.iitk.ac.in/

Regulatory Blog

###### Regulatory Insights

\ Vol 08 Issue 03 (Jan-26) \ Vol 08 Issue 02 (Oct-25) \ Vol 08 Issue 01 (Jul-25)

###### Power Chronicle

\ Vol 07 Issue 02 (Oct 24) \ Vol 07 Issue 01 (Jul 24) \ Vol 06 Issue 04 (Apr 24)

##### Publications

search

close [search

RERC (Compensation for part load operation for the generating stations below the normative level of operation), 2025 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Nw==) [search

RERC (Battery Energy Storage Systems), 2025 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Ng==) [search

Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1NQ==) [search

CERC Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First A

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1NA==) [search

Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) contracts

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Mw==) [search

CERC Petition on (Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO))

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1MQ==) [search

MoP Draft Electricity (Amendment) Bill, 2025

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Mg==) [search

CERC (Power Market) (First Amendment) Regulations, 2025

](https://cer.iitk.ac.in/blog/new_blog/?id=MjgwMA==) [search

HPERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc5OQ==) [search

IEX Petition (Introduction of the Peak Day Ahead Market (Peak DAM) and Peak Real Time Market (Peak RTM) at Indian Energy Exchange Limited

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc5Ng==) [search

Renewable Consumption Obligation (RCO) Under the Energy Conservation Act, 2001

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2OQ==) [search

Energy Conservation (Compliance Enforcement) Rules, 2025

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2OA==) [search

CEA: “Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022.”

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2Ng==) [search

KSERC (Renewable Energy and Related Matters) Regulations 2025

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2Nw==) [search

Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Project, 2025

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2NQ==) [search

CERC (Virtual Power Purchase Agreements (VPPAs)) Guidelines, 2025

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2NA==) [search

Ministry of Coal (Public Consultation on Coal Trade Exchange)

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc1MQ==) [search

Draft amendments proposed in the MBDs for Procurement of Power for Long term from Thermal Power Stations set up on DBFOO basis -Reg.

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc1MA==) [search

TNERC (Renewable Energy Purchase Obligation) (Amendment) Regulation, 2025

](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc0Nw==) [search

CERC: Indian Energy Exchange petition before Commission on introduction of Green Real Time Market segment on its trading platform

](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNg==) [search

Gazette Notification on Renewable Consumption Obligation (RCO) notified on 20th Oct 2023, 2025

](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNQ==) [search

BERC (Renewable Purchase Obligation, its compliance and REC Framework Implementation) Regulations

](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNA==) [search

HERC (Green Energy Open Access) Regulations, 2023 1st Amendment Regulations, 2025 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjcxMg==) [search

Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MjcxMQ==) [search

RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwOQ==) [search

UPERC “MYT for Distribution and Transmission Tariff” (Third Amendment) Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwNQ==) [search

Draft Procedure for Mechanism of Compensation for Degradation of Heat Rate, Auxiliary Consumption, and Secondary Fuel Oil Consumption Due to Part Load Operation and Multiple Start/Stop of Units

](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwNA==) [search

Draft Regulation on Framework for Resource Adequacy

](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMw==) [search

CERC (Terms and Conditions for Purchase and Sale of Carbon Credit Certificates) Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMg==) [search

CEA Draft discussion paper on “Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under Resource Adequacy Framework”

](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMQ==) [search

Terms and Conditions for Determination of Generation Tariff Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjYzNA==) [search

AERC (Demand Response) Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjYwNg==) [search

MoP (Tariff based competitive bidding guidelines for procurement of storage capacity/stored energy from Pumped Storage Plants), 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU4Mg==) [search

CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024. [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU4MQ==) [search

OERC - Regulation on Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU3OA==) [search

OERC - Regulation on Framework for Resource Adequacy [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU3Nw==) [search

MPERC "Ancillary Services" Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2NQ==) [search

CERC: Staff Paper on Regulatory Oversight on Bidding Behaviour in Power Exchanges

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2NA==) [search

DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024. [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2Mw==) [search

DERC (Renewable Purchase Obligation and RE Certificate Framework Implementation) Regulations, 2024

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2Mg==) [search

TNERC: TNERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1OQ==) [search

UERC Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1OA==) [search

UERC "Tariff and Others Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations" (First Amendment) Regulations, 2024. [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1Nw==) [search

CERC (Deviation Settlement and Related Matters) Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1Ng==) [search

MNRE (Draft Guidelines for implementation of PM-Surya Ghar: Muft Bijli Yojana for component to "CFA to Residential Sector"), 2024

](https://cer.iitk.ac.in/blog/new_blog/?id=MjQyNw==) [search

Revised Draft on KERC (Verification of captive status of generating plants/consumers in the State of Karnataka) Regulation, 2024

](https://cer.iitk.ac.in/blog/new_blog/?id=MjQyNg==) [search

APSERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2024

](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5NA==) [search

APSERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Ng==) [search

CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024

](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5NQ==) [search

CERC: Commission (Terms and Conditions of Tariff) Regulations, 2024 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Mw==) [search

Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024

](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Mg==) [search

JSERC (Terms and Conditions for Green Energy Open-access) Regulations, 2024

](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5MQ==) [search

CEA: Proposed procedure for verification of captive status of such generating plants, where captive generating plant and its captive user(s) are located in more than one state [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjMxOQ==) [search

Procedure, Terms and Conditions for grant of Transmission Licence and other related matters, Regulations, 2023

](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwOQ==) [search

Detailed Procedure for Compliance Mechanism under the Indian Carbon Market, 2023 [draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwOA==) [search

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNw==) [search

Approach Paper On Terms and Conditions of Tariff Regulations

](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNQ==) [search

BRPL Letter dt. 17th April, 2023

](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNA==) [search

CERC Staff Paper on Market Coupling

](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwMw==) [search

Grid India (Detailed Procedures for Security Constrained Unit Commitment (SCUC), Unit Shut Down (USD), and Security Constrained Economic Despatch (SCED) at Regional Level), 2023 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwMg==) [search

UERC (Terms and Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations, 2023

](https://cer.iitk.ac.in/blog/new_blog/?id=MjI4NQ==) [search

DERC (Net Metering for Renewable Energy) (First Amendment) Regulations, 2023 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjI4NA==) [search

CEA: Guidelines for RA Planning Framework for India, 2023

](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3NQ==) [search

HERC Draft Notification on "Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 (3rd Amendment) Regulation, 2023".

](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3NA==) [search

CEA: Draft Guidelines for Medium and Long Term Power Demand Forecast

](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3Mw==) [search

MPERC (Draft guidelines for Approach Paper on “Methodology for Estimation of Electricity generated from Biomass in Biomass co-fired thermal power plants”)

](https://cer.iitk.ac.in/blog/new_blog/?id=MjI2OA==) [search

RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjI1NA==) [search

MoP’s Proposal on Draft Electricity (Amendment) Rules, 2023

](https://cer.iitk.ac.in/blog/new_blog/?id=MjI1Mw==) [search

CERC (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjEyNw==) [search

Ministry of Power (Draft guidelines to promote development of Pump Storage Projects in the country)

](https://cer.iitk.ac.in/blog/new_blog/?id=MjEyNA==) [search

HERC Draft Notification on “Green Energy Open Access Regulation 2023"

](https://cer.iitk.ac.in/blog/new_blog/?id=MjExNw==) [search

POSOCO: Draft Detailed Procedure for Tertiary Reserve Ancillary Service (TRAS)

](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5OQ==) [search

MoP (Draft Proposal on Day Ahead Operation of Security Constrained Economic Dispatch) 2023, [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5OA==) [search

JSERC (Modalities of Tariff Determination) Regulations, 2023 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5Nw==) [search

Notification of Renewable Generation Obligation as per Revised Tariff Policy 2016

](https://cer.iitk.ac.in/blog/new_blog/?id=MTk4Ng==) [search

Central Electricity Regulatory Commission (Staff Paper on Power Market Pricing), October 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MTk4NQ==) [search

UPERC (Modalities of Tariff Determination) Regulations, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTk2Ng==) [search

PSERC (Terms and Conditions for determination of Generation, Transmission Wheeling and Retail Supply Tariff)(1st Amendment) Regulations, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTk2NQ==) [search

CERC: Staff Paper on Power Market

](https://cer.iitk.ac.in/blog/new_blog/?id=MTkzMQ==) [search

MoP: Concept Note on Pooling of Tariff of 25 years Plus Thermal/Gas Generating Stations

](https://cer.iitk.ac.in/blog/new_blog/?id=MTkzMA==) [search

Electricity (Amendment), Bill

](https://cer.iitk.ac.in/blog/new_blog/?id=MTkyMQ==) [search

Policy paper for Indian Carbon Market, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2NQ==) [search

CEA: Draft Guidelines for Resource Adequacy Planning Framework for India

](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2NA==) [search

UPERC Verification of Generating Plants and Captive Consumers, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2Mw==) [search

MNRE National Repowering Policy for Wind Power Projects, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTg1OA==) [search

CERC (Terms and Conditions for Dealing in Energy Saving Certificates) (First Amendment) Regulations, 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MTg1Nw==) [search

CERC (Sharing of Inter-State Transmission Charges and Losses) (First Amendment) Regulations, 2022[Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTYyMw==) [search

Central Electricity Authority (Flexible operation of Thermal Power Plants) Regulations, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTU2Nw==) [search

MoP’s Proposal on High Price Market Segment for Day Ahead Market (HP-DAM)

](https://cer.iitk.ac.in/blog/new_blog/?id=MTU2MA==) [search

The Uttar Pradesh Solar Energy Policy, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTU1OQ==) [search

MPERC (Power Purchase and Procurement Process) Regulations, Revision-II, 2022 (RG-19(2) of 2022) [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTU1NA==) [search

POSOCO (Detailed Procedure for REC Mechanism in compliance of CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022) [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTQ3MA==) [search

UERC (Standards of Performance) Regulations, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTQwOQ==) [search

WBERC (Open Access) Regulations, 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTM1OQ==) [search

POSOCO (Detailed Procedure for Estimation of the Requirement of SRAS & TRAS at Regional Level), 2022 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTM1NA==) [search

Draft GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MTE1Mw==) [search

Draft APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzOQ==) [search

Draft GERC (Security Deposit) (Third Amendment) Regulations, 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzNw==) [search

Draft GERC (Consumer Grievances Redressal Forum and Ombudsman) (First Amendment) Regulations, 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMw==) [search

Draft GERC (Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzNA==) [search

Draft Guidelines for UERC (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2022

](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMg==) [search

CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMQ==) [search

CERC: Draft Guidelines for Registration and Filing Application for Establishing and Operating Over the Counter (OTC) Platform

](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMA==) [search

Ministry of Power Amendments to Guidelines for short-term Procurement of Power (i.e. for a period of more than one day to one year) by Distribution Licensees through Tariff based bidding process [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0OA==) [search

TNERC (Grid connectivity and Intra-State Open Access) (Amendment) Regulations, 2014 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0MQ==) [search

HPERC (Consumer Grievances Redressal Forum and Ombudsman) (Second Amendment) Regulations, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0MA==) [search

APERC (Terms and Conditions for short-term procurement/sale of power) Regulation, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=MTAzOQ==) [search

OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=MTAzNQ==) [search

CEA Draft (Deletion and modifications of Formats for furnishing of the Statistics, Returns or Information, its time schedule and periodicity), 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=MTAyOA==) [search

Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters)

](https://cer.iitk.ac.in/blog/new_blog/?id=OTUy) [search

Ministry of Power Electricity (Rights of Consumers) Amendment Rules, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=OTQ0) [search

RERC (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=ODgy) [search

Draft Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=ODgx) [search

Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for determination of tariff according to Multi-Year Tariff principles and Methodology and Procedure for determination of Expected revenue from Tariff and Charges) Regulations, 2021 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=ODcy) [search

Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22 and onwards till reviewed/revised by the UERC

](https://cer.iitk.ac.in/blog/new_blog/?id=ODcz) [search

Tamil Nadu Electricity Supply Code on stipulating harmonic limits, Methodology of measurements, meter standards, penalties etc., to ensure quality of supply to consumers [Draft Amendment]

](https://cer.iitk.ac.in/blog/new_blog/?id=ODc0) [search

Discussion Paper on Market Based Economic Dispatch (MBED)

](https://cer.iitk.ac.in/blog/new_blog/?id=ODUx) [search

Draft CERC (Ancillary Services) Regulations, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ4) [search

Discussion paper on redesigning the Renewable Energy Certificate (REC) Mechanism

](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ1) [search

HPERC (Security Deposit) (Fourth Amendment) Regulations, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ0) [search

Proposed Amendments in JERC for the State of Goa & UTs (Electricity Supply Code) Regulations, 2018

](https://cer.iitk.ac.in/blog/new_blog/?id=ODQz) [search

Proposed OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=ODQx) [search

National Electricity Policy, 2021 (Draft)

](https://cer.iitk.ac.in/blog/new_blog/?id=ODQw) [search

Electricity (Rights of Consumers) (Amendment) Rules, 2021.

](https://cer.iitk.ac.in/blog/new_blog/?id=ODM5) [search

Implementation of Budget Initiatives for the Power and Renewable Energy Sector

](https://cer.iitk.ac.in/blog/new_blog/?id=ODM4) [search

Electricity (Change in Law, Must-run status, and other Matters) Rules, 2020

](https://cer.iitk.ac.in/blog/new_blog/?id=ODMw) [search

Draft Joint Electricity Regulatory Commission for the state of Goa and Union Territories (Generation, Transmission and Distribution Multi-year tariff) Regulations, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=ODA2) [search

Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 [Proposal]

](https://cer.iitk.ac.in/blog/new_blog/?id=ODA0) [search

Tripura Electricity Regulatory Commission (Consumer Prepaid Metering) Regulations, 2021

](https://cer.iitk.ac.in/blog/new_blog/?id=Nzk0) [search

Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2020

](https://cer.iitk.ac.in/blog/new_blog/?id=Nzgy) [search

RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020

](https://cer.iitk.ac.in/blog/new_blog/?id=NzYz) [search

CERC Terms and Conditions for Tariff determination from Renewable Energy Sources (RES) Regulation, 2020

](https://cer.iitk.ac.in/blog/new_blog/?id=NTk2) [search

Electricity Act, 2003 Amendment 2020 [Draft]

](https://cer.iitk.ac.in/blog/new_blog/?id=NTk3) [search

MNRE: Draft Guidelines for Implementation od Off-Grid Solar Power Plants in RESCO model under MNRE Programme

](https://cer.iitk.ac.in/blog/new_blog/?id=NTk4) [search

WBERC’s Draft for Amendment to Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations

](https://cer.iitk.ac.in/blog/new_blog/?id=NDY4) [search

CSERC Standard of Performance (SoP) in Distribution of Electricity Regulation, 2020

](https://cer.iitk.ac.in/blog/new_blog/?id=NDY2) [search

MERC’s Draft for State Grid Code Regulations, 2020

](https://cer.iitk.ac.in/blog/new_blog/?id=NDYw) [search

CERC's Proposal for Determination of Forbearance Price and Floor Price for the REC Framework

](https://cer.iitk.ac.in/blog/new_blog/?id=NDYz) [search

HERC: Guidelines for certifying or refusing to certify non-availability to Transmission/Distribution system or Unscheduled Load Shedding

](https://cer.iitk.ac.in/blog/new_blog/?id=NDYy) [search

CEA proposes amendment to Furnishing of Statistics, Returns and Information Regulations, 2007

](https://cer.iitk.ac.in/blog/new_blog/?id=NDYx) [search

POSOCO's "Draft Procedure for Collective Transactions through Real Time Market (RTM)"

](https://cer.iitk.ac.in/blog/new_blog/?id=NDI1) [search

GERC's "Tariff Framework for Procurement of Power by Distribution Licensees and Others from Solar Energy Projects and Other Commercial Issues for the State of Gujarat"

](https://cer.iitk.ac.in/blog/new_blog/?id=NDI0) [search

TNERC's "Consultative Paper for Procurement of Solar and Wind Power by Distribution Licensee and Related Issues"

](https://cer.iitk.ac.in/blog/new_blog/?id=NDIy) [search

APERC's "2nd Draft Amendment to Open Access Regulation"

](https://cer.iitk.ac.in/blog/new_blog/?id=NDIw)

Sort Latest Earliest

clear

Search result for

\ \

?>

RERC (Compensation for part load operation for the generating stations below the normative level of operation), 2025 [Draft]

Part Load Operation send Compensation

29 January 2026

The RERC notified the draft on Compensation for Part Load Operation for the Generating Stations below the Normative Level of Operation, 2025, issued on December, 2025. The main objectives of the proposed draft are:Objective: The draft order establishes a clear and transparent regulation for compensating thermal generating stations that are required to operate below the normative level of operation. In accordance with Regulation 51 of the RERC (Rajasthan ...read more

\

link

\ \

?>

RERC (Battery Energy Storage Systems), 2025 [Draft]

Renewable send Energy Storage Systems

29 January 2026

The RERC notified draft on Battery Energy Storage Systems Regulations, 2025. The main objectives of the proposed regulations are:Objective: The regulations aim to enable the deployment and utilization of Battery Energy Storage Systems (BESS) as integral components of generation, transmission, and distribution infrastructure, while facilitating their participation in ancillary services and energy markets. They seek to promote cost-effective energy storage solutions that enhance grid stability, support frequency regulation, ...read more

\

link

\ \

?>

Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

Transmission send Deviation Settlement Mechanism

29 January 2026

The CERC issued discussion paper on “Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 1st April, 2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024”, issued on 10th September, 2025. The main objectives of the proposed in the discussion paper are:Objective: The draft proposal aims to determine ...read more

\

link

\ \

?>

CERC Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First A

Renewable send REC Framework

29 January 2026

The CERC notified draft on Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, issued on 22nd September, 2025. The main objectives of the proposed regulations are:Objective: The draft regulation aims to align the Renewable Energy Certificate (REC) framework with the Renewable Consumption Obligation (RCO) regime under the Energy Conservation Act, 2001, and strengthen RECs as a credible compliance instrument. It expands the ...read more

\

link

\ \

?>

Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) contracts

Power Markets send Green RTM and High Price RTM

29 January 2026

The Hindustan Power Exchange (HPX) Limited, filed petition to the CERC on Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) Contracts, on 12th December, 2025. The main objectives of the petition are:Objective: The petition aims to introduce Green Real Time Market (G-RTM) and High Price Real Time Market (HP-RTM) contracts on the HPX platform to enhance market depth, flexibility, and price discovery in the real-time segment. ...read more

\

link

\ \

?>

CERC Petition on (Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO))

Green Energy send Renewable Consumption Obligation

29 January 2026

The CERC invited comments, suggestions and objections on discussion paper Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO), issued on 5th December, 2025. The key objectives are:Objective: The objective is to determine a buyout price as an alternate compliance mechanism for meeting Renewable Consumption Obligation (RCO) in line with the Ministry of Power’s notification. It links the buyout price to ...read more

\

link

\ \

?>

MoP Draft Electricity (Amendment) Bill, 2025

Electricity send Amendment Act

29 January 2026

The MoP notified the draft on Electricity (Amendment) Bill, 2025, issued on 9th October, 2025.The key objectives of the draft are mentioned below:Objective: The Draft Electricity (Amendment) Bill, 2025 aims to strengthen India's power sector so it can deliver affordable, reliable, and clean electricity for all, while supporting the country's transition toward a sustainable and competitive economy. The amendments seek to ensure the financial health of distribution companies ...read more

\

link

\ \

?>

CERC (Power Market) (First Amendment) Regulations, 2025

Power Markets send Power Market Design

10 March 2026

The CERC notified draft on CERC (Power Market) (First Amendment) Regulations, 2025, issued on 17th June 2025. The main objectives of the proposed regulations are:Objective: The CERC seeks to strengthen the evolving framework of electricity trading by expanding role of Over-the-Counter (OTC) platforms and incorporating Virtual Power Purchase Agreements (VPPAs). The amendment aims to promote innovation in market instruments, and provide flexibility for buyers and sellers through structured ...read more

\

link

\ \

?>

HPERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025 [Draft]

Transmission send Deviation Settlement Mechanism

15 October 2025

...read more

\

link

\ \

?>

IEX Petition (Introduction of the Peak Day Ahead Market (Peak DAM) and Peak Real Time Market (Peak RTM) at Indian Energy Exchange Limited

send

16 September 2025

...read more

\

link

\ \

Renewable Consumption Obligation (RCO) Under the Energy Conservation Act, 2001

Renewable Energy send RCO / RPO

28 August 2025

...read more

\

link

\ \

Energy Conservation (Compliance Enforcement) Rules, 2025

Renewable Energy send Compliance

28 August 2025

...read more

\

link

\ \

?>

CEA: “Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022.”

Electricity send FPPCA

06 August 2025

...read more

\

link

\ \

?>

KSERC (Renewable Energy and Related Matters) Regulations 2025

Renewable Energy send Tariff, RPO

06 August 2025

...read more

\

link

\ \

?>

Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Project, 2025

Renewable Energy send Procurements

16 July 2025

...read more

\

link

\ \

?>

CERC (Virtual Power Purchase Agreements (VPPAs)) Guidelines, 2025

Power Markets send Renewable Energy Contracts

10 July 2025

...read more

\

link

\ \

Ministry of Coal (Public Consultation on Coal Trade Exchange)

Market send Coal Trade Exchange

11 June 2025

...read more

\

link

\ \

Draft amendments proposed in the MBDs for Procurement of Power for Long term from Thermal Power Stations set up on DBFOO basis -Reg.

Generation send Thermal Power Plant

11 June 2025

...read more

\

link

\ \

?>

TNERC (Renewable Energy Purchase Obligation) (Amendment) Regulation, 2025

Green Energy send Renewable Purchase Obligation & REC

11 June 2025

...read more

\

link

\ \

?>

CERC: Indian Energy Exchange petition before Commission on introduction of Green Real Time Market segment on its trading platform

Power Markets send Power Market Design

14 May 2025

...read more

\

link

\ \

?>

Gazette Notification on Renewable Consumption Obligation (RCO) notified on 20th Oct 2023, 2025

Green Energy send Renewable Purchase Obligation & REC

02 May 2025

...read more

\

link

\ \

?>

BERC (Renewable Purchase Obligation, its compliance and REC Framework Implementation) Regulations

Green Energy send Renewable Purchase Obligation & REC

22 April 2025

...read more

\

link

\ \

?>

HERC (Green Energy Open Access) Regulations, 2023 1st Amendment Regulations, 2025 [Draft]

Green Energy send Open Access

11 April 2025

...read more

\

link

\ \

?>

Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022

Electricity send FPPCA

11 April 2025

...read more

\

link

\ \

?>

RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 [Draft]

Renewable send Open Access and Captive Generation

04 March 2025

...read more

\

link

\ \

?>

UPERC “MYT for Distribution and Transmission Tariff” (Third Amendment) Regulations, 2024 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

04 February 2025

...read more

\

link

\ \

Draft Procedure for Mechanism of Compensation for Degradation of Heat Rate, Auxiliary Consumption, and Secondary Fuel Oil Consumption Due to Part Load Operation and Multiple Start/Stop of Units

Part Load Operation send Compensation

04 February 2025

...read more

\

link

\ \

Draft Regulation on Framework for Resource Adequacy

Resource Adequacy send Resource Adequacy

04 February 2025

...read more

\

link

\ \

?>

CERC (Terms and Conditions for Purchase and Sale of Carbon Credit Certificates) Regulations, 2024 [Draft]

Indian Carbon Market (ICM) send Carbon Credit Certificate

08 January 2025

...read more

\

link

\ \

?>

CEA Draft discussion paper on “Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under Resource Adequacy Framework”

Discussion Paper send Coincident Peak, Capacity Credit, Recourse Adequacy

07 January 2025

...read more

\

link

\ \

?>

Terms and Conditions for Determination of Generation Tariff Regulations, 2024 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

10 December 2024

...read more

\

link

\ \

?>

AERC (Demand Response) Regulations, 2024 [Draft]

Demand Response send Demand Response

04 December 2024

...read more

\

link

\ \

?>

MoP (Tariff based competitive bidding guidelines for procurement of storage capacity/stored energy from Pumped Storage Plants), 2024 [Draft]

Renewable send Hydro Pumped Storage

11 November 2024

...read more

\

link

\ \

?>

CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024. [Draft]

Amendment send Terms and Conditions of Tariff

08 November 2024

...read more

\

link

\ \

?>

OERC - Regulation on Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024 [Draft]

Renewable send Procurement of Energy from Renewable Sources

07 October 2024

...read more

\

link

\ \

?>

OERC - Regulation on Framework for Resource Adequacy [Draft]

Guidelines send Resource Adequacy

07 October 2024

...read more

\

link

\ \

?>

MPERC "Ancillary Services" Regulations, 2024 [Draft]

Electricity send Ancillary Services

19 September 2024

...read more

\

link

\ \

?>

CERC: Staff Paper on Regulatory Oversight on Bidding Behaviour in Power Exchanges

Staff Paper send Market Monitoring

06 September 2024

...read more

\

link

\ \

?>

DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024. [Draft]

Renewable send Open Access and Captive Generation

05 September 2024

...read more

\

link

\ \

?>

DERC (Renewable Purchase Obligation and RE Certificate Framework Implementation) Regulations, 2024

Green Energy send Renewable Purchase Obligation & REC

29 August 2024

...read more

\

link

\ \

?>

TNERC: TNERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]

Guidelines send Resource Adequacy

13 August 2024

...read more

\

link

\ \

?>

UERC Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

13 August 2024

...read more

\

link

\ \

?>

UERC "Tariff and Others Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations" (First Amendment) Regulations, 2024. [Draft]

Renewable send Renewable Purchase Obligation

29 July 2024

...read more

\

link

\ \

?>

CERC (Deviation Settlement and Related Matters) Regulations, 2024 [Draft]

Transmission send Deviation Settlement Mechanism

29 July 2024

...read more

\

link

\ \

?>

MNRE (Draft Guidelines for implementation of PM-Surya Ghar: Muft Bijli Yojana for component to "CFA to Residential Sector"), 2024

Renewable Energy send Rooftop Solar Generation

22 May 2024

...read more

\

link

\ \

Revised Draft on KERC (Verification of captive status of generating plants/consumers in the State of Karnataka) Regulation, 2024

Generation send Captive Generating Plant

20 May 2024

...read more

\

link

\ \

?>

APSERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2024

Renewable Energy send Generation

26 April 2024

...read more

\

link

\ \

?>

APSERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]

Guidelines send Resource Adequacy

25 April 2024

...read more

\

link

\ \

?>

CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024

Renewable send Tariff

25 April 2024

...read more

\

link

\ \

?>

CERC: Commission (Terms and Conditions of Tariff) Regulations, 2024 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

23 April 2024

...read more

\

link

\ \

Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024

Transmission send Inter-State Transmission

18 April 2024

...read more

\

link

\ \

?>

JSERC (Terms and Conditions for Green Energy Open-access) Regulations, 2024

Generation send Green Energy

05 April 2024

...read more

\

link

\ \

?>

CEA: Proposed procedure for verification of captive status of such generating plants, where captive generating plant and its captive user(s) are located in more than one state [Draft]

Generation send Captive Generating Plant

31 January 2024

...read more

\

link

\ \

Procedure, Terms and Conditions for grant of Transmission Licence and other related matters, Regulations, 2023

Transmission send Transmission licence

22 December 2023

...read more

\

link

\ \

?>

Detailed Procedure for Compliance Mechanism under the Indian Carbon Market, 2023 [draft]

Indian Carbon Market (ICM) send Carbon Credit Trading Scheme

22 December 2023

...read more

\

link

\ \

?>

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

01 December 2023

...read more

\

link

\ \

Approach Paper On Terms and Conditions of Tariff Regulations

Regulations send Tariff - Generation, Distribution, Transmission

17 November 2023

...read more

\

link

\ \

?>

BRPL Letter dt. 17th April, 2023

Rooftop Solar send Renewable Purchase Obligation

07 November 2023

...read more

\

link

\ \

?>

CERC Staff Paper on Market Coupling

Power Markets send Market Coupling

30 October 2023

...read more

\

link

\ \

?>

Grid India (Detailed Procedures for Security Constrained Unit Commitment (SCUC), Unit Shut Down (USD), and Security Constrained Economic Despatch (SCED) at Regional Level), 2023 [Draft]

Power Markets send SCED - Power Market

26 October 2023

...read more

\

link

\ \

?>

UERC (Terms and Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations, 2023

Electricity send FPPCA

13 September 2023

...read more

\

link

\ \

?>

DERC (Net Metering for Renewable Energy) (First Amendment) Regulations, 2023 [Draft]

Electricity send Renewable Energy

13 September 2023

...read more

\

link

\ \

?>

CEA: Guidelines for RA Planning Framework for India, 2023

Guidelines send Resource Adequacy

07 August 2023

...read more

\

link

\ \

?>

HERC Draft Notification on "Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 (3rd Amendment) Regulation, 2023".

Single Point Supply send Duty to supply Electricity

02 August 2023

...read more

\

link

\ \

?>

CEA: Draft Guidelines for Medium and Long Term Power Demand Forecast

Guidelines send Forecasting

14 July 2023

...read more

\

link

\ \

?>

MPERC (Draft guidelines for Approach Paper on “Methodology for Estimation of Electricity generated from Biomass in Biomass co-fired thermal power plants”)

Generation send Renewable - Thermal

28 June 2023

...read more

\

link

\ \

?>

RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023 [Draft]

Electricity send Renewable Energy

16 June 2023

...read more

\

link

\ \

?>

MoP’s Proposal on Draft Electricity (Amendment) Rules, 2023

Electricity send Rules

16 June 2023

...read more

\

link

\ \

?>

CERC (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023 [Draft]

Transmission send Tariff - Transmission

24 May 2023

...read more

\

link

\ \

?>

Ministry of Power (Draft guidelines to promote development of Pump Storage Projects in the country)

Renewable send Hydro Pumped Storage

03 May 2023

...read more

\

link

\ \

?>

HERC Draft Notification on “Green Energy Open Access Regulation 2023"

Open Access send Green Open Access

02 May 2023

...read more

\

link

\ \

?>

POSOCO: Draft Detailed Procedure for Tertiary Reserve Ancillary Service (TRAS)

Procedure send TRAS

10 April 2023

...read more

\

link

\ \

?>

MoP (Draft Proposal on Day Ahead Operation of Security Constrained Economic Dispatch) 2023, [Draft]

Power Markets send DA-SCED

21 March 2023

...read more

\

link

\ \

?>

JSERC (Modalities of Tariff Determination) Regulations, 2023 [Draft]

Regulations send Tariff - Generation, Distribution, Transmission

17 March 2023

...read more

\

link

\ \

?>

Notification of Renewable Generation Obligation as per Revised Tariff Policy 2016

Generation send Renewable

17 February 2023

...read more

\

link

\ \

?>

Central Electricity Regulatory Commission (Staff Paper on Power Market Pricing), October 2022

Power Markets send Power Market Design

17 February 2023

...read more

\

link

\ \

?>

UPERC (Modalities of Tariff Determination) Regulations, 2022 [Draft]

Regulations send Tariff - Generation, Distribution, Transmission

10 February 2023

...read more

\

link

\ \

?>

PSERC (Terms and Conditions for determination of Generation, Transmission Wheeling and Retail Supply Tariff)(1st Amendment) Regulations, 2022 [Draft]

Regulations send Tariff - Generation, Distribution, Transmission

10 February 2023

...read more

\

link

\ \

?>

CERC: Staff Paper on Power Market

Regulations send Staff Paper on Power Market

30 January 2023

...read more

\

link

\ \

?>

MoP: Concept Note on Pooling of Tariff of 25 years Plus Thermal/Gas Generating Stations

Guidelines send Pooling

30 January 2023

...read more

\

link

\ \

?>

Electricity (Amendment), Bill

Electricity send Acts

27 January 2023

...read more

\

link

\ \

?>

Policy paper for Indian Carbon Market, 2022 [Draft]

Policy send Carbon Market

12 December 2022

...read more

\

link

\ \

?>

CEA: Draft Guidelines for Resource Adequacy Planning Framework for India

Guidelines send Resource Adequacy

06 December 2022

...read more

\

link

\ \

?>

UPERC Verification of Generating Plants and Captive Consumers, 2022 [Draft]

Generation send Captive Generation

06 December 2022

...read more

\

link

\ \

?>

MNRE National Repowering Policy for Wind Power Projects, 2022 [Draft]

Renewable send Wind Technology

25 November 2022

...read more

\

link

\ \

?>

CERC (Terms and Conditions for Dealing in Energy Saving Certificates) (First Amendment) Regulations, 2022

Power Markets send ESCerts

25 November 2022

...read more

\

link

\ \

?>

CERC (Sharing of Inter-State Transmission Charges and Losses) (First Amendment) Regulations, 2022[Draft]

Transmission send Tariff - Transmission

27 September 2022

...read more

\

link

\ \

Central Electricity Authority (Flexible operation of Thermal Power Plants) Regulations, 2022 [Draft]

Generation send Engineering - Generation

01 September 2022

...read more

\

link

\ \

?>

MoP’s Proposal on High Price Market Segment for Day Ahead Market (HP-DAM)

Power Markets send DAM market

31 August 2022

...read more

\

link

\ \

?>

The Uttar Pradesh Solar Energy Policy, 2022 [Draft]

Electricity send Solar Policy

31 August 2022

...read more

\

link

\ \

?>

MPERC (Power Purchase and Procurement Process) Regulations, Revision-II, 2022 (RG-19(2) of 2022) [Draft]

Regulations send Power Procurement Planning

29 August 2022

...read more

\

link

\ \

?>

POSOCO (Detailed Procedure for REC Mechanism in compliance of CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022) [Draft]

Renewable send REC Framework

12 August 2022

...read more

\

link

\ \

?>

UERC (Standards of Performance) Regulations, 2022 [Draft]

Distribution send Standard of Performance

29 July 2022

...read more

\

link

\ \

?>

WBERC (Open Access) Regulations, 2022 [Draft]

Power Markets send Open Access

08 July 2022

...read more

\

link

\ \

?>

POSOCO (Detailed Procedure for Estimation of the Requirement of SRAS & TRAS at Regional Level), 2022 [Draft]

Power Markets send Ancillary Services

07 July 2022

...read more

\

link

\ \

Draft GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2022

Consumer send Electricity Supply Code and Related Matters

06 April 2022

...read more

\

link

\ \

Draft APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022

Renewable send Renewable Purchase Obligation

01 April 2022

...read more

\

link

\ \

Draft GERC (Security Deposit) (Third Amendment) Regulations, 2022

Consumer send Security Deposit

01 April 2022

...read more

\

link

\ \

Draft GERC (Consumer Grievances Redressal Forum and Ombudsman) (First Amendment) Regulations, 2022

Consumer send Consumer Grievances Redressal Forum and Ombudsman

01 April 2022

...read more

\

link

\ \

Draft GERC (Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2022

Consumer send Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges

01 April 2022

...read more

\

link

\ \

Draft Guidelines for UERC (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2022

Transmission send Deviation Settlement Mechanism

23 March 2022

...read more

\

link

\ \

?>

CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021

Regulations send Tariff - Generation, Distribution, Transmission

23 March 2022

...read more

\

link

\ \

?>

CERC: Draft Guidelines for Registration and Filing Application for Establishing and Operating Over the Counter (OTC) Platform

Guidelines send Over The Counter (OTC) Platform

16 March 2022

...read more

\

link

\ \

?>

Ministry of Power Amendments to Guidelines for short-term Procurement of Power (i.e. for a period of more than one day to one year) by Distribution Licensees through Tariff based bidding process [Draft]

Guidelines send Short-term power procurement

13 January 2022

...read more

\

link

\ \

?>

TNERC (Grid connectivity and Intra-State Open Access) (Amendment) Regulations, 2014 [Draft]

Distribution send Intra-State Open-Access

04 January 2022

...read more

\

link

\ \

?>

HPERC (Consumer Grievances Redressal Forum and Ombudsman) (Second Amendment) Regulations, 2021

Regulations send Consumer Grievances Redressal Forum & Ombudsman

27 December 2021

...read more

\

link

\ \

?>

APERC (Terms and Conditions for short-term procurement/sale of power) Regulation, 2021

Regulations send Short - Term Power Procurement

24 December 2021

...read more

\

link

\ \

?>

OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021 [Draft]

Renewable send Renewable Purchase Obligation

17 December 2021

...read more

\

link

\ \

?>

CEA Draft (Deletion and modifications of Formats for furnishing of the Statistics, Returns or Information, its time schedule and periodicity), 2021

Regulations send Data Format

15 December 2021

...read more

\

link

\ \

Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters)

Transmission send Deviation Settlement Mechanism

25 October 2021

...read more

\

link

\ \

?>

Ministry of Power Electricity (Rights of Consumers) Amendment Rules, 2021

Electricity send Rules

22 October 2021

...read more

\

link

\ \

?>

RERC (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021 [Draft]

Renewable send Renewable Purchase Obligation

24 September 2021

...read more

\

link

\ \

Draft Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2021

Renewable send Green Energy Open Access

21 September 2021

...read more

\

link

\ \

?>

Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for determination of tariff according to Multi-Year Tariff principles and Methodology and Procedure for determination of Expected revenue from Tariff and Charges) Regulations, 2021 [Draft]

Regulations send Tariff - Generation, Distribution, Transmission

07 September 2021

...read more

\

link

\ \

?>

Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22 and onwards till reviewed/revised by the UERC

Renewable send Benchmark Capital Cost

01 September 2021

...read more

\

link

\ \

?>

Tamil Nadu Electricity Supply Code on stipulating harmonic limits, Methodology of measurements, meter standards, penalties etc., to ensure quality of supply to consumers [Draft Amendment]

Electricity send Harmonics

02 August 2021

...read more

\

link

\ \

?>

Discussion Paper on Market Based Economic Dispatch (MBED)

RCP - PMEO 01 | Power Market Economics and Operation (2021) send Market Based Economic Dispatch (MBED)

30 July 2021

...read more

\

link

\ \

Draft CERC (Ancillary Services) Regulations, 2021

Electricity send Ancillary Services

27 July 2021

...read more

\

link

\ \

?>

Discussion paper on redesigning the Renewable Energy Certificate (REC) Mechanism

Renewable send REC Framework

01 July 2021

...read more

\

link

\ \

?>

HPERC (Security Deposit) (Fourth Amendment) Regulations, 2021

Electricity send Security deposit

11 June 2021

...read more

\

link

\ \

?>

Proposed Amendments in JERC for the State of Goa & UTs (Electricity Supply Code) Regulations, 2018

Electricity send Supply Code

08 June 2021

...read more

\

link

\ \

Proposed OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021

Renewable send Renewable Purchase Obligation

01 June 2021

...read more

\

link

\ \

?>

National Electricity Policy, 2021 (Draft)

Electricity send Policy

21 May 2021

...read more

\

link

\ \

?>

Electricity (Rights of Consumers) (Amendment) Rules, 2021.

Electricity send Rules

07 May 2021

...read more

\

link

\ \

?>

Implementation of Budget Initiatives for the Power and Renewable Energy Sector

Power and RE Sector send Union Budget - 2021

27 April 2021

...read more

\

link

\ \

?>

Electricity (Change in Law, Must-run status, and other Matters) Rules, 2020

Electricity send Rules

27 April 2021

...read more

\

link

\ \

?>

Draft Joint Electricity Regulatory Commission for the state of Goa and Union Territories (Generation, Transmission and Distribution Multi-year tariff) Regulations, 2021

Distribution send Tariff - Distribution

19 March 2021

...read more

\

link

\ \

?>

Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 [Proposal]

Renewable send Tariff

15 March 2021

...read more

\

link

\ \

?>

Tripura Electricity Regulatory Commission (Consumer Prepaid Metering) Regulations, 2021

Distribution send Consumer Prepaid Metering

09 March 2021

...read more

\

link

\ \

?>

Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2020

Transmission send State Grid Code Regulation

06 March 2021

...read more

\

link

\ \

?>

RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020

Renewable send Tariff

19 February 2021

...read more

\

link

\ \

?>

CERC Terms and Conditions for Tariff determination from Renewable Energy Sources (RES) Regulation, 2020

Renewable send Tariff

27 November 2020

...read more

\

link

\ \

?>

Electricity Act, 2003 Amendment 2020 [Draft]

Electricity send Acts

27 November 2020

...read more

\

link

\ \

?>

MNRE: Draft Guidelines for Implementation od Off-Grid Solar Power Plants in RESCO model under MNRE Programme

Fundamentals of Renewable Energy: Economics, Policy and Regulation send Renewable Energy Development

27 November 2020

...read more

\

link

\ \

?>

WBERC’s Draft for Amendment to Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations

Fundamentals of Renewable Energy: Economics, Policy and Regulation send RE Policy and Regulation

06 July 2020

...read more

\

link

\ \

?>

CSERC Standard of Performance (SoP) in Distribution of Electricity Regulation, 2020

Distribution send Standard of Performance

08 June 2020

...read more

\

link

\ \

?>

MERC’s Draft for State Grid Code Regulations, 2020

Transmission send State Grid Code Regulation

25 May 2020

...read more

\

link

\ \

?>

CERC's Proposal for Determination of Forbearance Price and Floor Price for the REC Framework

Renewable send REC Framework

25 May 2020

...read more

\

link

\ \

?>

HERC: Guidelines for certifying or refusing to certify non-availability to Transmission/Distribution system or Unscheduled Load Shedding

Distribution send Open Access

25 May 2020

...read more

\

link

\ \

?>

CEA proposes amendment to Furnishing of Statistics, Returns and Information Regulations, 2007

System Operation & Forecasting send Data Collection

25 May 2020

...read more

\

link

\ \

?>

POSOCO's "Draft Procedure for Collective Transactions through Real Time Market (RTM)"

Power Markets send Real Time Market (RTM)

12 April 2020

...read more

\

link

\ \

?>

GERC's "Tariff Framework for Procurement of Power by Distribution Licensees and Others from Solar Energy Projects and Other Commercial Issues for the State of Gujarat"

Renewable send Solar Power Procurement

07 April 2020

...read more

\

link

\ \

?>

TNERC's "Consultative Paper for Procurement of Solar and Wind Power by Distribution Licensee and Related Issues"

Renewable send Renewable Power Procurement

26 March 2020

...read more

\

link

\ \

?>

APERC's "2nd Draft Amendment to Open Access Regulation"

Renewable send Open Access and Captive Generation

23 March 2020

...read more

\

link

\ \

APERC's "2nd Draft Amendment to Open Access Regulation"

Renewable send Open Access and Captive Generation

23 March 2020

...read more

\

link

\ \

TNERC's "Consultative Paper for Procurement of Solar and Wind Power by Distribution Licensee and Related Issues"

Renewable send Renewable Power Procurement

26 March 2020

...read more

\

link

\ \

GERC's "Tariff Framework for Procurement of Power by Distribution Licensees and Others from Solar Energy Projects and Other Commercial Issues for the State of Gujarat"

Renewable send Solar Power Procurement

07 April 2020

...read more

\

link

\ \

POSOCO's "Draft Procedure for Collective Transactions through Real Time Market (RTM)"

Power Markets send Real Time Market (RTM)

12 April 2020

...read more

\

link

\ \

CEA proposes amendment to Furnishing of Statistics, Returns and Information Regulations, 2007

System Operation & Forecasting send Data Collection

25 May 2020

...read more

\

link

\ \

HERC: Guidelines for certifying or refusing to certify non-availability to Transmission/Distribution system or Unscheduled Load Shedding

Distribution send Open Access

25 May 2020

...read more

\

link

\ \

CERC's Proposal for Determination of Forbearance Price and Floor Price for the REC Framework

Renewable send REC Framework

25 May 2020

...read more

\

link

\ \

MERC’s Draft for State Grid Code Regulations, 2020

Transmission send State Grid Code Regulation

25 May 2020

...read more

\

link

\ \

CSERC Standard of Performance (SoP) in Distribution of Electricity Regulation, 2020

Distribution send Standard of Performance

08 June 2020

...read more

\

link

\ \

WBERC’s Draft for Amendment to Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations

Fundamentals of Renewable Energy: Economics, Policy and Regulation send RE Policy and Regulation

06 July 2020

...read more

\

link

\ \

MNRE: Draft Guidelines for Implementation od Off-Grid Solar Power Plants in RESCO model under MNRE Programme

Fundamentals of Renewable Energy: Economics, Policy and Regulation send Renewable Energy Development

27 November 2020

...read more

\

link

\ \

Electricity Act, 2003 Amendment 2020 [Draft]

Electricity send Acts

27 November 2020

...read more

\

link

\ \

CERC Terms and Conditions for Tariff determination from Renewable Energy Sources (RES) Regulation, 2020

Renewable send Tariff

27 November 2020

...read more

\

link

\ \

RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020

Renewable send Tariff

19 February 2021

...read more

\

link

\ \

Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2020

Transmission send State Grid Code Regulation

06 March 2021

...read more

\

link

\ \

Tripura Electricity Regulatory Commission (Consumer Prepaid Metering) Regulations, 2021

Distribution send Consumer Prepaid Metering

09 March 2021

...read more

\

link

\ \

Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 [Proposal]

Renewable send Tariff

15 March 2021

...read more

\

link

\ \

Draft Joint Electricity Regulatory Commission for the state of Goa and Union Territories (Generation, Transmission and Distribution Multi-year tariff) Regulations, 2021

Distribution send Tariff - Distribution

19 March 2021

...read more

\

link

\ \

Electricity (Change in Law, Must-run status, and other Matters) Rules, 2020

Electricity send Rules

27 April 2021

...read more

\

link

\ \

Implementation of Budget Initiatives for the Power and Renewable Energy Sector

Power and RE Sector send Union Budget - 2021

27 April 2021

...read more

\

link

\ \

Electricity (Rights of Consumers) (Amendment) Rules, 2021.

Electricity send Rules

07 May 2021

...read more

\

link

\ \

National Electricity Policy, 2021 (Draft)

Electricity send Policy

21 May 2021

...read more

\

link

\ \

Proposed OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021

Renewable send Renewable Purchase Obligation

01 June 2021

...read more

\

link

\ \

Proposed Amendments in JERC for the State of Goa & UTs (Electricity Supply Code) Regulations, 2018

Electricity send Supply Code

08 June 2021

...read more

\

link

\ \

HPERC (Security Deposit) (Fourth Amendment) Regulations, 2021

Electricity send Security deposit

11 June 2021

...read more

\

link

\ \

Discussion paper on redesigning the Renewable Energy Certificate (REC) Mechanism

Renewable send REC Framework

01 July 2021

...read more

\

link

\ \

Draft CERC (Ancillary Services) Regulations, 2021

Electricity send Ancillary Services

27 July 2021

...read more

\

link

\ \

Discussion Paper on Market Based Economic Dispatch (MBED)

RCP - PMEO 01 | Power Market Economics and Operation (2021) send Market Based Economic Dispatch (MBED)

30 July 2021

...read more

\

link

\ \

Tamil Nadu Electricity Supply Code on stipulating harmonic limits, Methodology of measurements, meter standards, penalties etc., to ensure quality of supply to consumers [Draft Amendment]

Electricity send Harmonics

02 August 2021

...read more

\

link

\ \

Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22 and onwards till reviewed/revised by the UERC

Renewable send Benchmark Capital Cost

01 September 2021

...read more

\

link

\ \

Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for determination of tariff according to Multi-Year Tariff principles and Methodology and Procedure for determination of Expected revenue from Tariff and Charges) Regulations, 2021 [Draft]

Regulations send Tariff - Generation, Distribution, Transmission

07 September 2021

...read more

\

link

\ \

Draft Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2021

Renewable send Green Energy Open Access

21 September 2021

...read more

\

link

\ \

RERC (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021 [Draft]

Renewable send Renewable Purchase Obligation

24 September 2021

...read more

\

link

\ \

Ministry of Power Electricity (Rights of Consumers) Amendment Rules, 2021

Electricity send Rules

22 October 2021

...read more

\

link

\ \

Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters)

Transmission send Deviation Settlement Mechanism

25 October 2021

...read more

\

link

\ \

CEA Draft (Deletion and modifications of Formats for furnishing of the Statistics, Returns or Information, its time schedule and periodicity), 2021

Regulations send Data Format

15 December 2021

...read more

\

link

\ \

OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021 [Draft]

Renewable send Renewable Purchase Obligation

17 December 2021

...read more

\

link

\ \

APERC (Terms and Conditions for short-term procurement/sale of power) Regulation, 2021

Regulations send Short - Term Power Procurement

24 December 2021

...read more

\

link

\ \

HPERC (Consumer Grievances Redressal Forum and Ombudsman) (Second Amendment) Regulations, 2021

Regulations send Consumer Grievances Redressal Forum & Ombudsman

27 December 2021

...read more

\

link

\ \

TNERC (Grid connectivity and Intra-State Open Access) (Amendment) Regulations, 2014 [Draft]

Distribution send Intra-State Open-Access

04 January 2022

...read more

\

link

\ \

Ministry of Power Amendments to Guidelines for short-term Procurement of Power (i.e. for a period of more than one day to one year) by Distribution Licensees through Tariff based bidding process [Draft]

Guidelines send Short-term power procurement

13 January 2022

...read more

\

link

\ \

CERC: Draft Guidelines for Registration and Filing Application for Establishing and Operating Over the Counter (OTC) Platform

Guidelines send Over The Counter (OTC) Platform

16 March 2022

...read more

\

link

\ \

CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021

Regulations send Tariff - Generation, Distribution, Transmission

23 March 2022

...read more

\

link

\ \

Draft Guidelines for UERC (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2022

Transmission send Deviation Settlement Mechanism

23 March 2022

...read more

\

link

\ \

Draft GERC (Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2022

Consumer send Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges

01 April 2022

...read more

\

link

\ \

Draft GERC (Consumer Grievances Redressal Forum and Ombudsman) (First Amendment) Regulations, 2022

Consumer send Consumer Grievances Redressal Forum and Ombudsman

01 April 2022

...read more

\

link

\ \

Draft GERC (Security Deposit) (Third Amendment) Regulations, 2022

Consumer send Security Deposit

01 April 2022

...read more

\

link

\ \

Draft APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022

Renewable send Renewable Purchase Obligation

01 April 2022

...read more

\

link

\ \

Draft GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2022

Consumer send Electricity Supply Code and Related Matters

06 April 2022

...read more

\

link

\ \

POSOCO (Detailed Procedure for Estimation of the Requirement of SRAS & TRAS at Regional Level), 2022 [Draft]

Power Markets send Ancillary Services

07 July 2022

...read more

\

link

\ \

WBERC (Open Access) Regulations, 2022 [Draft]

Power Markets send Open Access

08 July 2022

...read more

\

link

\ \

UERC (Standards of Performance) Regulations, 2022 [Draft]

Distribution send Standard of Performance

29 July 2022

...read more

\

link

\ \

POSOCO (Detailed Procedure for REC Mechanism in compliance of CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022) [Draft]

Renewable send REC Framework

12 August 2022

...read more

\

link

\ \

MPERC (Power Purchase and Procurement Process) Regulations, Revision-II, 2022 (RG-19(2) of 2022) [Draft]

Regulations send Power Procurement Planning

29 August 2022

...read more

\

link

\ \

The Uttar Pradesh Solar Energy Policy, 2022 [Draft]

Electricity send Solar Policy

31 August 2022

...read more

\

link

\ \

MoP’s Proposal on High Price Market Segment for Day Ahead Market (HP-DAM)

Power Markets send DAM market

31 August 2022

...read more

\

link

\ \

Central Electricity Authority (Flexible operation of Thermal Power Plants) Regulations, 2022 [Draft]

Generation send Engineering - Generation

01 September 2022

...read more

\

link

\ \

CERC (Sharing of Inter-State Transmission Charges and Losses) (First Amendment) Regulations, 2022[Draft]

Transmission send Tariff - Transmission

27 September 2022

...read more

\

link

\ \

CERC (Terms and Conditions for Dealing in Energy Saving Certificates) (First Amendment) Regulations, 2022

Power Markets send ESCerts

25 November 2022

...read more

\

link

\ \

MNRE National Repowering Policy for Wind Power Projects, 2022 [Draft]

Renewable send Wind Technology

25 November 2022

...read more

\

link

\ \

UPERC Verification of Generating Plants and Captive Consumers, 2022 [Draft]

Generation send Captive Generation

06 December 2022

...read more

\

link

\ \

CEA: Draft Guidelines for Resource Adequacy Planning Framework for India

Guidelines send Resource Adequacy

06 December 2022

...read more

\

link

\ \

Policy paper for Indian Carbon Market, 2022 [Draft]

Policy send Carbon Market

12 December 2022

...read more

\

link

\ \

Electricity (Amendment), Bill

Electricity send Acts

27 January 2023

...read more

\

link

\ \

MoP: Concept Note on Pooling of Tariff of 25 years Plus Thermal/Gas Generating Stations

Guidelines send Pooling

30 January 2023

...read more

\

link

\ \

CERC: Staff Paper on Power Market

Regulations send Staff Paper on Power Market

30 January 2023

...read more

\

link

\ \

PSERC (Terms and Conditions for determination of Generation, Transmission Wheeling and Retail Supply Tariff)(1st Amendment) Regulations, 2022 [Draft]

Regulations send Tariff - Generation, Distribution, Transmission

10 February 2023

...read more

\

link

\ \

UPERC (Modalities of Tariff Determination) Regulations, 2022 [Draft]

Regulations send Tariff - Generation, Distribution, Transmission

10 February 2023

...read more

\

link

\ \

Central Electricity Regulatory Commission (Staff Paper on Power Market Pricing), October 2022

Power Markets send Power Market Design

17 February 2023

...read more

\

link

\ \

Notification of Renewable Generation Obligation as per Revised Tariff Policy 2016

Generation send Renewable

17 February 2023

...read more

\

link

\ \

JSERC (Modalities of Tariff Determination) Regulations, 2023 [Draft]

Regulations send Tariff - Generation, Distribution, Transmission

17 March 2023

...read more

\

link

\ \

MoP (Draft Proposal on Day Ahead Operation of Security Constrained Economic Dispatch) 2023, [Draft]

Power Markets send DA-SCED

21 March 2023

...read more

\

link

\ \

POSOCO: Draft Detailed Procedure for Tertiary Reserve Ancillary Service (TRAS)

Procedure send TRAS

10 April 2023

...read more

\

link

\ \

HERC Draft Notification on “Green Energy Open Access Regulation 2023"

Open Access send Green Open Access

02 May 2023

...read more

\

link

\ \

Ministry of Power (Draft guidelines to promote development of Pump Storage Projects in the country)

Renewable send Hydro Pumped Storage

03 May 2023

...read more

\

link

\ \

CERC (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023 [Draft]

Transmission send Tariff - Transmission

24 May 2023

...read more

\

link

\ \

MoP’s Proposal on Draft Electricity (Amendment) Rules, 2023

Electricity send Rules

16 June 2023

...read more

\

link

\ \

RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023 [Draft]

Electricity send Renewable Energy

16 June 2023

...read more

\

link

\ \

MPERC (Draft guidelines for Approach Paper on “Methodology for Estimation of Electricity generated from Biomass in Biomass co-fired thermal power plants”)

Generation send Renewable - Thermal

28 June 2023

...read more

\

link

\ \

CEA: Draft Guidelines for Medium and Long Term Power Demand Forecast

Guidelines send Forecasting

14 July 2023

...read more

\

link

\ \

HERC Draft Notification on "Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Require Security Regulations 2016 (3rd Amendment) Regulation, 2023".

Single Point Supply send Duty to supply Electricity

02 August 2023

...read more

\

link

\ \

CEA: Guidelines for RA Planning Framework for India, 2023

Guidelines send Resource Adequacy

07 August 2023

...read more

\

link

\ \

DERC (Net Metering for Renewable Energy) (First Amendment) Regulations, 2023 [Draft]

Electricity send Renewable Energy

13 September 2023

...read more

\

link

\ \

UERC (Terms and Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations, 2023

Electricity send FPPCA

13 September 2023

...read more

\

link

\ \

Grid India (Detailed Procedures for Security Constrained Unit Commitment (SCUC), Unit Shut Down (USD), and Security Constrained Economic Despatch (SCED) at Regional Level), 2023 [Draft]

Power Markets send SCED - Power Market

26 October 2023

...read more

\

link

\ \

CERC Staff Paper on Market Coupling

Power Markets send Market Coupling

30 October 2023

...read more

\

link

\ \

BRPL Letter dt. 17th April, 2023

Rooftop Solar send Renewable Purchase Obligation

07 November 2023

...read more

\

link

\ \

Approach Paper On Terms and Conditions of Tariff Regulations

Regulations send Tariff - Generation, Distribution, Transmission

17 November 2023

...read more

\

link

\ \

Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

01 December 2023

...read more

\

link

\ \

Detailed Procedure for Compliance Mechanism under the Indian Carbon Market, 2023 [draft]

Indian Carbon Market (ICM) send Carbon Credit Trading Scheme

22 December 2023

...read more

\

link

\ \

Procedure, Terms and Conditions for grant of Transmission Licence and other related matters, Regulations, 2023

Transmission send Transmission licence

22 December 2023

...read more

\

link

\ \

CEA: Proposed procedure for verification of captive status of such generating plants, where captive generating plant and its captive user(s) are located in more than one state [Draft]

Generation send Captive Generating Plant

31 January 2024

...read more

\

link

\ \

JSERC (Terms and Conditions for Green Energy Open-access) Regulations, 2024

Generation send Green Energy

05 April 2024

...read more

\

link

\ \

Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024

Transmission send Inter-State Transmission

18 April 2024

...read more

\

link

\ \

CERC: Commission (Terms and Conditions of Tariff) Regulations, 2024 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

23 April 2024

...read more

\

link

\ \

CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024

Renewable send Tariff

25 April 2024

...read more

\

link

\ \

APSERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]

Guidelines send Resource Adequacy

25 April 2024

...read more

\

link

\ \

APSERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2024

Renewable Energy send Generation

26 April 2024

...read more

\

link

\ \

Revised Draft on KERC (Verification of captive status of generating plants/consumers in the State of Karnataka) Regulation, 2024

Generation send Captive Generating Plant

20 May 2024

...read more

\

link

\ \

MNRE (Draft Guidelines for implementation of PM-Surya Ghar: Muft Bijli Yojana for component to "CFA to Residential Sector"), 2024

Renewable Energy send Rooftop Solar Generation

22 May 2024

...read more

\

link

\ \

CERC (Deviation Settlement and Related Matters) Regulations, 2024 [Draft]

Transmission send Deviation Settlement Mechanism

29 July 2024

...read more

\

link

\ \

UERC "Tariff and Others Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations" (First Amendment) Regulations, 2024. [Draft]

Renewable send Renewable Purchase Obligation

29 July 2024

...read more

\

link

\ \

UERC Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

13 August 2024

...read more

\

link

\ \

TNERC: TNERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]

Guidelines send Resource Adequacy

13 August 2024

...read more

\

link

\ \

DERC (Renewable Purchase Obligation and RE Certificate Framework Implementation) Regulations, 2024

Green Energy send Renewable Purchase Obligation & REC

29 August 2024

...read more

\

link

\ \

DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024. [Draft]

Renewable send Open Access and Captive Generation

05 September 2024

...read more

\

link

\ \

CERC: Staff Paper on Regulatory Oversight on Bidding Behaviour in Power Exchanges

Staff Paper send Market Monitoring

06 September 2024

...read more

\

link

\ \

MPERC "Ancillary Services" Regulations, 2024 [Draft]

Electricity send Ancillary Services

19 September 2024

...read more

\

link

\ \

OERC - Regulation on Framework for Resource Adequacy [Draft]

Guidelines send Resource Adequacy

07 October 2024

...read more

\

link

\ \

OERC - Regulation on Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024 [Draft]

Renewable send Procurement of Energy from Renewable Sources

07 October 2024

...read more

\

link

\ \

CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024. [Draft]

Amendment send Terms and Conditions of Tariff

08 November 2024

...read more

\

link

\ \

MoP (Tariff based competitive bidding guidelines for procurement of storage capacity/stored energy from Pumped Storage Plants), 2024 [Draft]

Renewable send Hydro Pumped Storage

11 November 2024

...read more

\

link

\ \

AERC (Demand Response) Regulations, 2024 [Draft]

Demand Response send Demand Response

04 December 2024

...read more

\

link

\ \

Terms and Conditions for Determination of Generation Tariff Regulations, 2024 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

10 December 2024

...read more

\

link

\ \

CEA Draft discussion paper on “Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under Resource Adequacy Framework”

Discussion Paper send Coincident Peak, Capacity Credit, Recourse Adequacy

07 January 2025

...read more

\

link

\ \

CERC (Terms and Conditions for Purchase and Sale of Carbon Credit Certificates) Regulations, 2024 [Draft]

Indian Carbon Market (ICM) send Carbon Credit Certificate

08 January 2025

...read more

\

link

\ \

Draft Regulation on Framework for Resource Adequacy

Resource Adequacy send Resource Adequacy

04 February 2025

...read more

\

link

\ \

Draft Procedure for Mechanism of Compensation for Degradation of Heat Rate, Auxiliary Consumption, and Secondary Fuel Oil Consumption Due to Part Load Operation and Multiple Start/Stop of Units

Part Load Operation send Compensation

04 February 2025

...read more

\

link

\ \

UPERC “MYT for Distribution and Transmission Tariff” (Third Amendment) Regulations, 2024 [Draft]

Tariff Determination (MYT) send Tariff- Generation, Transmission, SLDC, Distribution

04 February 2025

...read more

\

link

\ \

RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 [Draft]

Renewable send Open Access and Captive Generation

04 March 2025

...read more

\

link

\ \

Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022

Electricity send FPPCA

11 April 2025

...read more

\

link

\ \

HERC (Green Energy Open Access) Regulations, 2023 1st Amendment Regulations, 2025 [Draft]

Green Energy send Open Access

11 April 2025

...read more

\

link

\ \

BERC (Renewable Purchase Obligation, its compliance and REC Framework Implementation) Regulations

Green Energy send Renewable Purchase Obligation & REC

22 April 2025

...read more

\

link

\ \

Gazette Notification on Renewable Consumption Obligation (RCO) notified on 20th Oct 2023, 2025

Green Energy send Renewable Purchase Obligation & REC

02 May 2025

...read more

\

link

\ \

CERC: Indian Energy Exchange petition before Commission on introduction of Green Real Time Market segment on its trading platform

Power Markets send Power Market Design

14 May 2025

...read more

\

link

\ \

TNERC (Renewable Energy Purchase Obligation) (Amendment) Regulation, 2025

Green Energy send Renewable Purchase Obligation & REC

11 June 2025

...read more

\

link

\ \

Draft amendments proposed in the MBDs for Procurement of Power for Long term from Thermal Power Stations set up on DBFOO basis -Reg.

Generation send Thermal Power Plant

11 June 2025

...read more

\

link

\ \

Ministry of Coal (Public Consultation on Coal Trade Exchange)

Market send Coal Trade Exchange

11 June 2025

...read more

\

link

\ \

CERC (Virtual Power Purchase Agreements (VPPAs)) Guidelines, 2025

Power Markets send Renewable Energy Contracts

10 July 2025

...read more

\

link

\ \

Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Project, 2025

Renewable Energy send Procurements

16 July 2025

...read more

\

link

\ \

KSERC (Renewable Energy and Related Matters) Regulations 2025

Renewable Energy send Tariff, RPO

06 August 2025

...read more

\

link

\ \

CEA: “Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022.”

Electricity send FPPCA

06 August 2025

...read more

\

link

\ \

Energy Conservation (Compliance Enforcement) Rules, 2025

Renewable Energy send Compliance

28 August 2025

...read more

\

link

\ \

Renewable Consumption Obligation (RCO) Under the Energy Conservation Act, 2001

Renewable Energy send RCO / RPO

28 August 2025

...read more

\

link

\ \

IEX Petition (Introduction of the Peak Day Ahead Market (Peak DAM) and Peak Real Time Market (Peak RTM) at Indian Energy Exchange Limited

send

16 September 2025

...read more

\

link

\ \

HPERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025 [Draft]

Transmission send Deviation Settlement Mechanism

15 October 2025

...read more

\

link

\ \

CERC (Power Market) (First Amendment) Regulations, 2025

Power Markets send Power Market Design

10 March 2026

The CERC notified draft on CERC (Power Market) (First Amendment) Regulations, 2025, issued on 17th June 2025. The main objectives of the proposed regulations are:Objective: The CERC seeks to strengthen the evolving framework of electricity trading by expanding role of Over-the-Counter (OTC) platforms and incorporating Virtual Power Purchase Agreements (VPPAs). The amendment aims to promote innovation in market instruments, and provide flexibility for buyers and sellers through structured ...read more

\

link

\ \

MoP Draft Electricity (Amendment) Bill, 2025

Electricity send Amendment Act

29 January 2026

The MoP notified the draft on Electricity (Amendment) Bill, 2025, issued on 9th October, 2025.The key objectives of the draft are mentioned below:Objective: The Draft Electricity (Amendment) Bill, 2025 aims to strengthen India's power sector so it can deliver affordable, reliable, and clean electricity for all, while supporting the country's transition toward a sustainable and competitive economy. The amendments seek to ensure the financial health of distribution companies ...read more

\

link

\ \

CERC Petition on (Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO))

Green Energy send Renewable Consumption Obligation

29 January 2026

The CERC invited comments, suggestions and objections on discussion paper Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO), issued on 5th December, 2025. The key objectives are:Objective: The objective is to determine a buyout price as an alternate compliance mechanism for meeting Renewable Consumption Obligation (RCO) in line with the Ministry of Power’s notification. It links the buyout price to ...read more

\

link

\ \

Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) contracts

Power Markets send Green RTM and High Price RTM

29 January 2026

The Hindustan Power Exchange (HPX) Limited, filed petition to the CERC on Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) Contracts, on 12th December, 2025. The main objectives of the petition are:Objective: The petition aims to introduce Green Real Time Market (G-RTM) and High Price Real Time Market (HP-RTM) contracts on the HPX platform to enhance market depth, flexibility, and price discovery in the real-time segment. ...read more

\

link

\ \

CERC Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First A

Renewable send REC Framework

29 January 2026

The CERC notified draft on Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, issued on 22nd September, 2025. The main objectives of the proposed regulations are:Objective: The draft regulation aims to align the Renewable Energy Certificate (REC) framework with the Renewable Consumption Obligation (RCO) regime under the Energy Conservation Act, 2001, and strengthen RECs as a credible compliance instrument. It expands the ...read more

\

link

\ \

Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

Transmission send Deviation Settlement Mechanism

29 January 2026

The CERC issued discussion paper on “Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 1st April, 2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024”, issued on 10th September, 2025. The main objectives of the proposed in the discussion paper are:Objective: The draft proposal aims to determine ...read more

\

link

\ \

RERC (Battery Energy Storage Systems), 2025 [Draft]

Renewable send Energy Storage Systems

29 January 2026

The RERC notified draft on Battery Energy Storage Systems Regulations, 2025. The main objectives of the proposed regulations are:Objective: The regulations aim to enable the deployment and utilization of Battery Energy Storage Systems (BESS) as integral components of generation, transmission, and distribution infrastructure, while facilitating their participation in ancillary services and energy markets. They seek to promote cost-effective energy storage solutions that enhance grid stability, support frequency regulation, ...read more

\

link

\ \

RERC (Compensation for part load operation for the generating stations below the normative level of operation), 2025 [Draft]

Part Load Operation send Compensation

29 January 2026

The RERC notified the draft on Compensation for Part Load Operation for the Generating Stations below the Normative Level of Operation, 2025, issued on December, 2025. The main objectives of the proposed draft are:Objective: The draft order establishes a clear and transparent regulation for compensating thermal generating stations that are required to operate below the normative level of operation. In accordance with Regulation 51 of the RERC (Rajasthan ...read more

\

link

Recent Discussions

10 March 2026 \ Total Posts: 1     Post By: CER TEAM - RERC (Compensation for part load operation for the generating stations below the normative level of operation), 2025 [Draft]

29 January 2026 \ Total Posts: 1     Post By: CER TEAM - RERC (Battery Energy Storage Systems), 2025 [Draft]

29 January 2026 \ Total Posts: 1     Post By: CER TEAM - Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

29 January 2026 \ Total Posts: 1     Post By: CER TEAM - CERC Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First A

29 January 2026 \ Total Posts: 1     Post By: CER TEAM - Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) contracts

29 January 2026 \ Total Posts: 1     Post By: CER TEAM - CERC Petition on (Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO))

29 January 2026 \ Total Posts: 1     Post By: CER TEAM - MoP Draft Electricity (Amendment) Bill, 2025

29 January 2026 \ Total Posts: 1     Post By: CER TEAM - HPERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025 [Draft]

15 October 2025 \ Total Posts: 1     Post By: CER TEAM - Renewable Consumption Obligation (RCO) Under the Energy Conservation Act, 2001

28 August 2025 \ Total Posts: 1     Post By: CER TEAM - Energy Conservation (Compliance Enforcement) Rules, 2025

28 August 2025 \ Total Posts: 1     Post By: CER TEAM - CEA: “Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022.”

06 August 2025 \ Total Posts: 1     Post By: CER TEAM - KSERC (Renewable Energy and Related Matters) Regulations 2025

06 August 2025 \ Total Posts: 1     Post By: CER TEAM - Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Project, 2025

16 July 2025 \ Total Posts: 1     Post By: CER TEAM - CERC (Virtual Power Purchase Agreements (VPPAs)) Guidelines, 2025

10 July 2025 \ Total Posts: 1     Post By: CER TEAM