Metadata
Title
CER
Category
undergraduate
UUID
9b246a929ce74be4b7c578f73d7c198d
Source URL
https://cer.iitk.ac.in/blog
Parent URL
https://cer.iitk.ac.in/
Crawl Time
2026-03-18T08:18:12+00:00
Rendered Raw Markdown
# CER

**Source**: https://cer.iitk.ac.in/blog
**Parent**: https://cer.iitk.ac.in/

### **Regulatory Blog**

[###### Regulatory Insights](https://cer.iitk.ac.in/regulatory_insights)

[\
**Vol 08 Issue 03 (Jan-26)**](https://cer.iitk.ac.in/periodicals/regulatory_insights/Volume08_Issue03.pdf)
[\
**Vol 08 Issue 02 (Oct-25)**](https://cer.iitk.ac.in/periodicals/regulatory_insights/Volume08_Issue02.pdf)
[\
**Vol 08 Issue 01 (Jul-25)**](https://cer.iitk.ac.in/periodicals/regulatory_insights/Volume08_Issue01.pdf)

[###### Power Chronicle](https://eal.iitk.ac.in/power_chronicle.php)

[\
**Vol 07 Issue 02 (Oct 24)**](https://eal.iitk.ac.in/assets/docs/power_chronicle_vol_7_issue_2.pdf)
[\
**Vol 07 Issue 01 (Jul 24)**](https://eal.iitk.ac.in/assets/docs/power_chronicle_vol_7_issue_1.pdf)
[\
**Vol 06 Issue 04 (Apr 24)**](https://eal.iitk.ac.in/assets/docs/power_chronicle_vol_6_issue_4.pdf)

[##### Publications](https://cer.iitk.ac.in/publications)

*search*

[*close*](#head)
[*search*

**RERC (Compensation for part load operation for the generating stations below the normative level of operation), 2025 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Nw==)
[*search*

**RERC (Battery Energy Storage Systems), 2025 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Ng==)
[*search*

**Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1NQ==)
[*search*

**CERC Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First A**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1NA==)
[*search*

**Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) contracts**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Mw==)
[*search*

**CERC Petition on (Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO))**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1MQ==)
[*search*

**MoP Draft Electricity (Amendment) Bill, 2025**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Mg==)
[*search*

**CERC (Power Market) (First Amendment) Regulations, 2025**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjgwMA==)
[*search*

**HPERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc5OQ==)
[*search*

**IEX Petition (Introduction of the Peak Day Ahead Market (Peak DAM) and Peak Real Time Market (Peak RTM) at Indian Energy Exchange Limited**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc5Ng==)
[*search*

**Renewable Consumption Obligation (RCO) Under the Energy Conservation Act, 2001**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2OQ==)
[*search*

**Energy Conservation (Compliance Enforcement) Rules, 2025**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2OA==)
[*search*

**CEA: “Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022.”**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2Ng==)
[*search*

**KSERC (Renewable Energy and Related Matters) Regulations 2025**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2Nw==)
[*search*

**Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Project, 2025**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2NQ==)
[*search*

**CERC (Virtual Power Purchase Agreements (VPPAs)) Guidelines, 2025**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2NA==)
[*search*

**Ministry of Coal (Public Consultation on Coal Trade Exchange)**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc1MQ==)
[*search*

**Draft amendments proposed in the MBDs for Procurement of Power for Long term from Thermal Power Stations set up on DBFOO basis -Reg.**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc1MA==)
[*search*

**TNERC (Renewable Energy Purchase Obligation) (Amendment) Regulation, 2025**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc0Nw==)
[*search*

**CERC: Indian Energy Exchange petition before Commission on introduction of Green Real Time Market segment on its trading platform**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNg==)
[*search*

**Gazette Notification on Renewable Consumption Obligation (RCO) notified on 20th Oct 2023, 2025**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNQ==)
[*search*

**BERC (Renewable Purchase Obligation, its compliance and REC Framework Implementation) Regulations**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNA==)
[*search*

**HERC (Green Energy Open Access) Regulations, 2023 1st Amendment Regulations, 2025 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjcxMg==)
[*search*

**Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjcxMQ==)
[*search*

**RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwOQ==)
[*search*

**UPERC “MYT for Distribution and Transmission Tariff” (Third Amendment) Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwNQ==)
[*search*

**Draft Procedure for Mechanism of Compensation for Degradation of Heat Rate, Auxiliary Consumption, and Secondary Fuel Oil Consumption Due to Part Load Operation and Multiple Start/Stop of Units**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwNA==)
[*search*

**Draft Regulation on Framework for Resource Adequacy**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMw==)
[*search*

**CERC (Terms and Conditions for Purchase and Sale of Carbon Credit Certificates) Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMg==)
[*search*

**CEA Draft discussion paper on “Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under Resource Adequacy Framework”**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMQ==)
[*search*

**Terms and Conditions for Determination of Generation Tariff Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjYzNA==)
[*search*

**AERC (Demand Response) Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjYwNg==)
[*search*

**MoP (Tariff based competitive bidding guidelines for procurement of storage capacity/stored energy from Pumped Storage Plants), 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU4Mg==)
[*search*

**CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024. [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU4MQ==)
[*search*

**OERC - Regulation on Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024
[Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU3OA==)
[*search*

**OERC - Regulation on Framework for Resource Adequacy [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU3Nw==)
[*search*

**MPERC "Ancillary Services" Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2NQ==)
[*search*

**CERC: Staff Paper on Regulatory Oversight on Bidding Behaviour in Power Exchanges**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2NA==)
[*search*

**DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024. [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2Mw==)
[*search*

**DERC (Renewable Purchase Obligation and RE Certificate Framework Implementation) Regulations, 2024**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2Mg==)
[*search*

**TNERC: TNERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1OQ==)
[*search*

**UERC Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1OA==)
[*search*

**UERC "Tariff and Others Terms for Supply of Electricity from
Renewable Energy Sources and non-fossil fuel based Co-generating Stations" (First Amendment) Regulations, 2024.
[Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1Nw==)
[*search*

**CERC (Deviation Settlement and Related Matters) Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1Ng==)
[*search*

**MNRE (Draft Guidelines for implementation of PM-Surya Ghar: Muft Bijli Yojana for component to "CFA to Residential Sector"), 2024**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjQyNw==)
[*search*

**Revised Draft on KERC (Verification of captive status of generating plants/consumers in the State of Karnataka) Regulation, 2024**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjQyNg==)
[*search*

**APSERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2024**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5NA==)
[*search*

**APSERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Ng==)
[*search*

**CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5NQ==)
[*search*

**CERC: Commission (Terms and Conditions of Tariff) Regulations, 2024 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Mw==)
[*search*

**Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Mg==)
[*search*

**JSERC (Terms and Conditions for Green Energy Open-access) Regulations, 2024**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5MQ==)
[*search*

**CEA: Proposed procedure for verification of captive status of such generating plants, where captive generating plant and its captive user(s) are located in more than one state [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjMxOQ==)
[*search*

**Procedure, Terms and Conditions for grant of Transmission Licence and other related matters, Regulations, 2023**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwOQ==)
[*search*

**Detailed Procedure for Compliance Mechanism under the Indian Carbon Market, 2023 [draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwOA==)
[*search*

**Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNw==)
[*search*

**Approach Paper On Terms and Conditions of Tariff Regulations**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNQ==)
[*search*

**BRPL Letter dt. 17th April, 2023**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNA==)
[*search*

**CERC Staff Paper on Market Coupling**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwMw==)
[*search*

**Grid India (Detailed Procedures for Security Constrained Unit Commitment (SCUC), Unit Shut Down (USD), and Security Constrained Economic Despatch (SCED) at Regional Level), 2023 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwMg==)
[*search*

**UERC (Terms and Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations, 2023**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjI4NQ==)
[*search*

**DERC (Net Metering for Renewable Energy) (First Amendment) Regulations, 2023 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjI4NA==)
[*search*

**CEA: Guidelines for RA Planning Framework for India, 2023**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3NQ==)
[*search*

**HERC Draft Notification on "Duty to Supply Electricity on Request and Power to Recover
Expenditure and Power to Require Security Regulations 2016 (3rd Amendment)
Regulation, 2023".**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3NA==)
[*search*

**CEA: Draft Guidelines for Medium and Long Term Power Demand Forecast**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3Mw==)
[*search*

**MPERC (Draft guidelines for Approach Paper on “Methodology for Estimation of Electricity generated from Biomass in Biomass co-fired thermal power plants”)**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjI2OA==)
[*search*

**RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjI1NA==)
[*search*

**MoP’s Proposal on Draft Electricity (Amendment) Rules, 2023**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjI1Mw==)
[*search*

**CERC (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjEyNw==)
[*search*

**Ministry of Power (Draft guidelines to promote development of Pump Storage Projects in the country)**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjEyNA==)
[*search*

**HERC Draft Notification on “Green Energy Open Access Regulation 2023"**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjExNw==)
[*search*

**POSOCO: Draft Detailed Procedure for Tertiary Reserve Ancillary Service (TRAS)**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5OQ==)
[*search*

**MoP (Draft Proposal on Day Ahead Operation of Security Constrained Economic Dispatch) 2023, [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5OA==)
[*search*

**JSERC (Modalities of Tariff Determination) Regulations, 2023 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5Nw==)
[*search*

**Notification of Renewable Generation Obligation as per Revised Tariff Policy 2016**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTk4Ng==)
[*search*

**Central Electricity Regulatory Commission (Staff Paper on Power Market Pricing), October 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTk4NQ==)
[*search*

**UPERC (Modalities of Tariff Determination) Regulations, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTk2Ng==)
[*search*

**PSERC (Terms and Conditions for determination of Generation, Transmission Wheeling and Retail Supply Tariff)(1st Amendment) Regulations, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTk2NQ==)
[*search*

**CERC: Staff Paper on Power Market**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTkzMQ==)
[*search*

**MoP: Concept Note on Pooling of Tariff of 25 years Plus Thermal/Gas Generating Stations**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTkzMA==)
[*search*

**Electricity (Amendment), Bill**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTkyMQ==)
[*search*

**Policy paper for Indian Carbon Market, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2NQ==)
[*search*

**CEA: Draft Guidelines for Resource Adequacy Planning Framework for India**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2NA==)
[*search*

**UPERC Verification of Generating Plants and Captive Consumers, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2Mw==)
[*search*

**MNRE National Repowering Policy for Wind Power Projects, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTg1OA==)
[*search*

**CERC (Terms and Conditions for Dealing in Energy Saving Certificates) (First Amendment) Regulations, 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTg1Nw==)
[*search*

**CERC (Sharing of Inter-State Transmission Charges and Losses)
(First Amendment) Regulations, 2022[Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTYyMw==)
[*search*

**Central Electricity Authority (Flexible operation of Thermal Power Plants) Regulations, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTU2Nw==)
[*search*

**MoP’s Proposal on High Price Market Segment for Day Ahead Market (HP-DAM)**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTU2MA==)
[*search*

**The Uttar Pradesh Solar Energy Policy, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTU1OQ==)
[*search*

**MPERC (Power Purchase and Procurement Process) Regulations, Revision-II, 2022 (RG-19(2) of 2022) [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTU1NA==)
[*search*

**POSOCO (Detailed Procedure for REC Mechanism in compliance of CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022) [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTQ3MA==)
[*search*

**UERC (Standards of Performance) Regulations, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTQwOQ==)
[*search*

**WBERC (Open Access) Regulations, 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTM1OQ==)
[*search*

**POSOCO (Detailed Procedure for Estimation of the Requirement of SRAS & TRAS at Regional Level), 2022 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTM1NA==)
[*search*

**Draft GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTE1Mw==)
[*search*

**Draft APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzOQ==)
[*search*

**Draft GERC (Security Deposit) (Third Amendment) Regulations, 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzNw==)
[*search*

**Draft GERC (Consumer Grievances Redressal Forum and Ombudsman) (First Amendment) Regulations, 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMw==)
[*search*

**Draft GERC (Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzNA==)
[*search*

**Draft Guidelines for UERC (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2022**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMg==)
[*search*

**CERC (Connectivity and General Network Access to the inter-State
Transmission System) Regulations, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMQ==)
[*search*

**CERC: Draft Guidelines for Registration and Filing Application for Establishing and Operating Over the Counter (OTC) Platform**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMA==)
[*search*

**Ministry of Power Amendments to Guidelines for short-term Procurement of Power (i.e. for a period of more than one day to one year) by Distribution Licensees through Tariff based bidding process [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0OA==)
[*search*

**TNERC (Grid connectivity and Intra-State Open Access) (Amendment) Regulations, 2014 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0MQ==)
[*search*

**HPERC (Consumer Grievances Redressal Forum and Ombudsman) (Second Amendment) Regulations, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0MA==)
[*search*

**APERC (Terms and Conditions for short-term procurement/sale of power) Regulation, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTAzOQ==)
[*search*

**OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTAzNQ==)
[*search*

**CEA Draft (Deletion and modifications of Formats for furnishing of the Statistics, Returns or Information, its time schedule and periodicity), 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=MTAyOA==)
[*search*

**Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters)**

\](https://cer.iitk.ac.in/blog/new_blog/?id=OTUy)
[*search*

**Ministry of Power Electricity (Rights of Consumers) Amendment Rules, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=OTQ0)
[*search*

**RERC (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODgy)
[*search*

**Draft Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODgx)
[*search*

**Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for determination of tariff according to Multi-Year Tariff principles and Methodology and Procedure for determination of Expected revenue from Tariff and Charges) Regulations, 2021 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODcy)
[*search*

**Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22 and onwards till reviewed/revised by the UERC**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODcz)
[*search*

**Tamil Nadu Electricity Supply Code on stipulating harmonic limits, Methodology of measurements, meter standards, penalties etc., to ensure quality of supply to consumers [Draft Amendment]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODc0)
[*search*

**Discussion Paper on Market Based Economic Dispatch (MBED)**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODUx)
[*search*

**Draft CERC (Ancillary Services) Regulations, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ4)
[*search*

**Discussion paper on redesigning the Renewable Energy Certificate (REC) Mechanism**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ1)
[*search*

**HPERC (Security Deposit) (Fourth Amendment) Regulations, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ0)
[*search*

**Proposed Amendments in JERC for the State of Goa & UTs (Electricity Supply Code) Regulations, 2018**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODQz)
[*search*

**Proposed OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODQx)
[*search*

**National Electricity Policy, 2021 (Draft)**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODQw)
[*search*

**Electricity (Rights of Consumers) (Amendment) Rules, 2021.**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODM5)
[*search*

**Implementation of Budget Initiatives for the Power and Renewable Energy Sector**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODM4)
[*search*

**Electricity (Change in Law, Must-run status, and other Matters) Rules, 2020**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODMw)
[*search*

**Draft Joint Electricity Regulatory Commission for the state of Goa and Union Territories (Generation, Transmission and Distribution Multi-year tariff) Regulations, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODA2)
[*search*

**Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 [Proposal]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=ODA0)
[*search*

**Tripura Electricity Regulatory Commission (Consumer Prepaid Metering) Regulations, 2021**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Nzk0)
[*search*

**Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2020**

\](https://cer.iitk.ac.in/blog/new_blog/?id=Nzgy)
[*search*

**RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NzYz)
[*search*

**CERC Terms and Conditions for Tariff determination from Renewable Energy Sources (RES) Regulation, 2020**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NTk2)
[*search*

**Electricity Act, 2003 Amendment 2020 [Draft]**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NTk3)
[*search*

**MNRE: Draft Guidelines for Implementation od Off-Grid Solar Power Plants in RESCO model under MNRE Programme**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NTk4)
[*search*

**WBERC’s Draft for Amendment to Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDY4)
[*search*

**CSERC Standard of Performance (SoP) in Distribution of Electricity Regulation, 2020**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDY2)
[*search*

**MERC’s Draft for State Grid Code Regulations, 2020**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDYw)
[*search*

**CERC's Proposal for Determination of Forbearance Price and Floor Price for the REC Framework**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDYz)
[*search*

**HERC: Guidelines for certifying or refusing to certify non-availability to Transmission/Distribution system or Unscheduled Load Shedding**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDYy)
[*search*

**CEA proposes amendment to Furnishing of Statistics, Returns and Information Regulations, 2007**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDYx)
[*search*

**POSOCO's "Draft Procedure for Collective Transactions through Real Time
Market (RTM)"**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDI1)
[*search*

**GERC's "Tariff Framework for Procurement of Power by Distribution
Licensees and Others from Solar Energy Projects and Other Commercial
Issues for the State of Gujarat"**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDI0)
[*search*

**TNERC's "Consultative Paper for Procurement of Solar and Wind Power by
Distribution Licensee and Related Issues"**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDIy)
[*search*

**APERC's "2nd Draft Amendment to Open Access Regulation"**

\](https://cer.iitk.ac.in/blog/new_blog/?id=NDIw)

Sort
Latest
Earliest

[**clear**](https://cer.iitk.ac.in/blog)

Search result for

\
\

?>

[**RERC (Compensation for part load operation for the generating stations below the normative level of operation), 2025 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Nw==)

Part Load Operation
*send*
 Compensation

29 January 2026

The RERC notified the draft on Compensation for Part Load Operation for the Generating Stations below the Normative Level of Operation, 2025, issued on December, 2025. The main objectives of the proposed draft are:Objective: The draft order establishes a clear and transparent regulation for compensating thermal generating stations that are required to operate below the normative level of operation. In accordance with Regulation 51 of the RERC (Rajasthan
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Nw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**RERC (Battery Energy Storage Systems), 2025 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Ng==)

Renewable
*send*
 Energy Storage Systems

29 January 2026

The RERC notified draft on Battery Energy Storage Systems Regulations, 2025. The main objectives of the proposed regulations are:Objective: The regulations aim to enable the deployment and utilization of Battery Energy Storage Systems (BESS) as integral components of generation, transmission, and distribution infrastructure, while facilitating their participation in ancillary services and energy markets. They seek to promote cost-effective energy storage solutions that enhance grid stability, support frequency regulation,
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Ng==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1NQ==)

Transmission
*send*
 Deviation Settlement Mechanism

29 January 2026

The CERC issued discussion paper on “Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 1st April, 2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024”, issued on 10th September, 2025. The main objectives of the proposed in the discussion paper are:Objective: The draft proposal aims to determine
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First A**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1NA==)

Renewable
*send*
 REC Framework

29 January 2026

The CERC notified draft on Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, issued on 22nd September, 2025. The main objectives of the proposed regulations are:Objective: The draft regulation aims to align the Renewable Energy Certificate (REC) framework with the Renewable Consumption Obligation (RCO) regime under the Energy Conservation Act, 2001, and strengthen RECs as a credible compliance instrument. It expands the
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1NA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) contracts**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Mw==)

Power Markets
*send*
 Green RTM and High Price RTM

29 January 2026

The Hindustan Power Exchange (HPX) Limited, filed petition to the CERC on Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) Contracts, on 12th December, 2025. The main objectives of the petition are:Objective: The petition aims to introduce Green Real Time Market (G-RTM) and High Price Real Time Market (HP-RTM) contracts on the HPX platform to enhance market depth, flexibility, and price discovery in the real-time segment.
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Mw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC Petition on (Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO))**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1MQ==)

Green Energy
*send*
 Renewable Consumption Obligation

29 January 2026

The CERC invited comments, suggestions and objections on discussion paper Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO), issued on 5th December, 2025. The key objectives are:Objective: The objective is to determine a buyout price as an alternate compliance mechanism for meeting Renewable Consumption Obligation (RCO) in line with the Ministry of Power’s notification. It links the buyout price to
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1MQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MoP Draft Electricity (Amendment) Bill, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Mg==)

Electricity
*send*
 Amendment Act

29 January 2026

The MoP notified the draft on Electricity (Amendment) Bill, 2025, issued on 9th October, 2025.The key objectives of the draft are mentioned below:Objective: The Draft Electricity (Amendment) Bill, 2025 aims to strengthen India's power sector so it can deliver affordable, reliable, and clean electricity for all, while supporting the country's transition toward a sustainable and competitive economy. The amendments seek to ensure the financial health of distribution companies
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjg1Mg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Power Market) (First Amendment) Regulations, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=MjgwMA==)

Power Markets
*send*
 Power Market Design

10 March 2026

The CERC notified draft on CERC (Power Market) (First Amendment) Regulations, 2025, issued on 17th June 2025. The main objectives of the proposed regulations are:Objective: The CERC seeks to strengthen the evolving framework of electricity trading by expanding role of Over-the-Counter (OTC) platforms and incorporating Virtual Power Purchase Agreements (VPPAs). The amendment aims to promote innovation in market instruments, and provide flexibility for buyers and sellers through structured
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjgwMA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**HPERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc5OQ==)

Transmission
*send*
 Deviation Settlement Mechanism

15 October 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc5OQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**IEX Petition (Introduction of the Peak Day Ahead Market (Peak DAM) and Peak Real Time Market (Peak RTM) at Indian Energy Exchange Limited**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc5Ng==)

*send*

16 September 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc5Ng==)

\

[*link*](#)

- **Link Copied**

\
\

[**Renewable Consumption Obligation (RCO) Under the Energy Conservation Act, 2001**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2OQ==)

Renewable Energy
*send*
 RCO / RPO

28 August 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2OQ==)

\

[*link*](#)

- **Link Copied**

\
\

[**Energy Conservation (Compliance Enforcement) Rules, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2OA==)

Renewable Energy
*send*
 Compliance

28 August 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2OA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CEA: “Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022.”**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2Ng==)

Electricity
*send*
 FPPCA

06 August 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2Ng==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**KSERC (Renewable Energy and Related Matters) Regulations 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2Nw==)

Renewable Energy
*send*
 Tariff, RPO

06 August 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2Nw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Project, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2NQ==)

Renewable Energy
*send*
 Procurements

16 July 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Virtual Power Purchase Agreements (VPPAs)) Guidelines, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2NA==)

Power Markets
*send*
 Renewable Energy Contracts

10 July 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc2NA==)

\

[*link*](#)

- **Link Copied**

\
\

[**Ministry of Coal (Public Consultation on Coal Trade Exchange)**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc1MQ==)

Market
*send*
 Coal Trade Exchange

11 June 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc1MQ==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft amendments proposed in the MBDs for Procurement of Power for Long term from Thermal Power Stations set up on DBFOO basis -Reg.**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc1MA==)

Generation
*send*
 Thermal Power Plant

11 June 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc1MA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**TNERC (Renewable Energy Purchase Obligation) (Amendment) Regulation, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc0Nw==)

Green Energy
*send*
 Renewable Purchase Obligation & REC

11 June 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Mjc0Nw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC: Indian Energy Exchange petition before Commission on introduction of Green Real Time Market segment on its trading platform**](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNg==)

Power Markets
*send*
 Power Market Design

14 May 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Gazette Notification on Renewable Consumption Obligation (RCO) notified on 20th Oct 2023, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNQ==)

Green Energy
*send*
 Renewable Purchase Obligation & REC

02 May 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**BERC (Renewable Purchase Obligation, its compliance and REC Framework Implementation) Regulations**](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNA==)

Green Energy
*send*
 Renewable Purchase Obligation & REC

22 April 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjczNA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**HERC (Green Energy Open Access) Regulations, 2023 1st Amendment Regulations, 2025 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcxMg==)

Green Energy
*send*
 Open Access

11 April 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcxMg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcxMQ==)

Electricity
*send*
 FPPCA

11 April 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcxMQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwOQ==)

Renewable
*send*
 Open Access and Captive Generation

04 March 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwOQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**UPERC “MYT for Distribution and Transmission Tariff” (Third Amendment) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwNQ==)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

04 February 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwNQ==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Procedure for Mechanism of Compensation for Degradation of Heat Rate, Auxiliary Consumption, and Secondary Fuel Oil Consumption Due to Part Load Operation and Multiple Start/Stop of Units**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwNA==)

Part Load Operation
*send*
 Compensation

04 February 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwNA==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Regulation on Framework for Resource Adequacy**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMw==)

Resource Adequacy
*send*
 Resource Adequacy

04 February 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Terms and Conditions for Purchase and Sale of Carbon Credit Certificates) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMg==)

Indian Carbon Market (ICM)
*send*
 Carbon Credit Certificate

08 January 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CEA Draft discussion paper on “Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under Resource Adequacy Framework”**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMQ==)

Discussion Paper
*send*
 Coincident Peak, Capacity Credit, Recourse Adequacy

07 January 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjcwMQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Terms and Conditions for Determination of Generation Tariff Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjYzNA==)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

10 December 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjYzNA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**AERC (Demand Response) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjYwNg==)

Demand Response
*send*
 Demand Response

04 December 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjYwNg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MoP (Tariff based competitive bidding guidelines for procurement of storage capacity/stored energy from Pumped Storage Plants), 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU4Mg==)

Renewable
*send*
 Hydro Pumped Storage

11 November 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU4Mg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024. [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU4MQ==)

Amendment
*send*
 Terms and Conditions of Tariff

08 November 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU4MQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**OERC - Regulation on Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024
[Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU3OA==)

Renewable
*send*
 Procurement of Energy from Renewable Sources

07 October 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU3OA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**OERC - Regulation on Framework for Resource Adequacy [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU3Nw==)

Guidelines
*send*
 Resource Adequacy

07 October 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU3Nw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MPERC "Ancillary Services" Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2NQ==)

Electricity
*send*
 Ancillary Services

19 September 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC: Staff Paper on Regulatory Oversight on Bidding Behaviour in Power Exchanges**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2NA==)

Staff Paper
*send*
 Market Monitoring

06 September 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2NA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024. [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2Mw==)

Renewable
*send*
 Open Access and Captive Generation

05 September 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2Mw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**DERC (Renewable Purchase Obligation and RE Certificate Framework Implementation) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2Mg==)

Green Energy
*send*
 Renewable Purchase Obligation & REC

29 August 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU2Mg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**TNERC: TNERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1OQ==)

Guidelines
*send*
 Resource Adequacy

13 August 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1OQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**UERC Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1OA==)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

13 August 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1OA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**UERC "Tariff and Others Terms for Supply of Electricity from
Renewable Energy Sources and non-fossil fuel based Co-generating Stations" (First Amendment) Regulations, 2024.
[Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1Nw==)

Renewable
*send*
 Renewable Purchase Obligation

29 July 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1Nw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Deviation Settlement and Related Matters) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1Ng==)

Transmission
*send*
 Deviation Settlement Mechanism

29 July 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjU1Ng==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MNRE (Draft Guidelines for implementation of PM-Surya Ghar: Muft Bijli Yojana for component to "CFA to Residential Sector"), 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=MjQyNw==)

Renewable Energy
*send*
 Rooftop Solar Generation

22 May 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjQyNw==)

\

[*link*](#)

- **Link Copied**

\
\

[**Revised Draft on KERC (Verification of captive status of generating plants/consumers in the State of Karnataka) Regulation, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=MjQyNg==)

Generation
*send*
 Captive Generating Plant

20 May 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjQyNg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**APSERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5NA==)

Renewable Energy
*send*
 Generation

26 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5NA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**APSERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Ng==)

Guidelines
*send*
 Resource Adequacy

25 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Ng==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5NQ==)

Renewable
*send*
 Tariff

25 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC: Commission (Terms and Conditions of Tariff) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Mw==)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

23 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Mw==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Mg==)

Transmission
*send*
 Inter-State Transmission

18 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5Mg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**JSERC (Terms and Conditions for Green Energy Open-access) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5MQ==)

Generation
*send*
 Green Energy

05 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjM5MQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CEA: Proposed procedure for verification of captive status of such generating plants, where captive generating plant and its captive user(s) are located in more than one state [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMxOQ==)

Generation
*send*
 Captive Generating Plant

31 January 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMxOQ==)

\

[*link*](#)

- **Link Copied**

\
\

[**Procedure, Terms and Conditions for grant of Transmission Licence and other related matters, Regulations, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwOQ==)

Transmission
*send*
 Transmission licence

22 December 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwOQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Detailed Procedure for Compliance Mechanism under the Indian Carbon Market, 2023 [draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwOA==)

Indian Carbon Market (ICM)
*send*
 Carbon Credit Trading Scheme

22 December 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwOA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNw==)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

01 December 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNw==)

\

[*link*](#)

- **Link Copied**

\
\

[**Approach Paper On Terms and Conditions of Tariff Regulations**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNQ==)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

17 November 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**BRPL Letter dt. 17th April, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNA==)

Rooftop Solar
*send*
 Renewable Purchase Obligation

07 November 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwNA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC Staff Paper on Market Coupling**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwMw==)

Power Markets
*send*
 Market Coupling

30 October 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwMw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Grid India (Detailed Procedures for Security Constrained Unit Commitment (SCUC), Unit Shut Down (USD), and Security Constrained Economic Despatch (SCED) at Regional Level), 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwMg==)

Power Markets
*send*
 SCED - Power Market

26 October 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjMwMg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**UERC (Terms and Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI4NQ==)

Electricity
*send*
 FPPCA

13 September 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI4NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**DERC (Net Metering for Renewable Energy) (First Amendment) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI4NA==)

Electricity
*send*
 Renewable Energy

13 September 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI4NA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CEA: Guidelines for RA Planning Framework for India, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3NQ==)

Guidelines
*send*
 Resource Adequacy

07 August 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**HERC Draft Notification on "Duty to Supply Electricity on Request and Power to Recover
Expenditure and Power to Require Security Regulations 2016 (3rd Amendment)
Regulation, 2023".**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3NA==)

Single Point Supply
*send*
 Duty to supply Electricity

02 August 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3NA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CEA: Draft Guidelines for Medium and Long Term Power Demand Forecast**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3Mw==)

Guidelines
*send*
 Forecasting

14 July 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI3Mw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MPERC (Draft guidelines for Approach Paper on “Methodology for Estimation of Electricity generated from Biomass in Biomass co-fired thermal power plants”)**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI2OA==)

Generation
*send*
 Renewable - Thermal

28 June 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI2OA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI1NA==)

Electricity
*send*
 Renewable Energy

16 June 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI1NA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MoP’s Proposal on Draft Electricity (Amendment) Rules, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI1Mw==)

Electricity
*send*
 Rules

16 June 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjI1Mw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjEyNw==)

Transmission
*send*
 Tariff - Transmission

24 May 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjEyNw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Ministry of Power (Draft guidelines to promote development of Pump Storage Projects in the country)**](https://cer.iitk.ac.in/blog/new_blog/?id=MjEyNA==)

Renewable
*send*
 Hydro Pumped Storage

03 May 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjEyNA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**HERC Draft Notification on “Green Energy Open Access Regulation 2023"**](https://cer.iitk.ac.in/blog/new_blog/?id=MjExNw==)

Open Access
*send*
 Green Open Access

02 May 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjExNw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**POSOCO: Draft Detailed Procedure for Tertiary Reserve Ancillary Service (TRAS)**](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5OQ==)

Procedure
*send*
 TRAS

10 April 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5OQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MoP (Draft Proposal on Day Ahead Operation of Security Constrained Economic Dispatch) 2023, [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5OA==)

Power Markets
*send*
 DA-SCED

21 March 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5OA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**JSERC (Modalities of Tariff Determination) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5Nw==)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

17 March 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MjA5Nw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Notification of Renewable Generation Obligation as per Revised Tariff Policy 2016**](https://cer.iitk.ac.in/blog/new_blog/?id=MTk4Ng==)

Generation
*send*
 Renewable

17 February 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTk4Ng==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Central Electricity Regulatory Commission (Staff Paper on Power Market Pricing), October 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MTk4NQ==)

Power Markets
*send*
 Power Market Design

17 February 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTk4NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**UPERC (Modalities of Tariff Determination) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTk2Ng==)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

10 February 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTk2Ng==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**PSERC (Terms and Conditions for determination of Generation, Transmission Wheeling and Retail Supply Tariff)(1st Amendment) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTk2NQ==)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

10 February 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTk2NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC: Staff Paper on Power Market**](https://cer.iitk.ac.in/blog/new_blog/?id=MTkzMQ==)

Regulations
*send*
 Staff Paper on Power Market

30 January 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTkzMQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MoP: Concept Note on Pooling of Tariff of 25 years Plus Thermal/Gas Generating Stations**](https://cer.iitk.ac.in/blog/new_blog/?id=MTkzMA==)

Guidelines
*send*
 Pooling

30 January 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTkzMA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Electricity (Amendment), Bill**](https://cer.iitk.ac.in/blog/new_blog/?id=MTkyMQ==)

Electricity
*send*
 Acts

27 January 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTkyMQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Policy paper for Indian Carbon Market, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2NQ==)

Policy
*send*
 Carbon Market

12 December 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2NQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CEA: Draft Guidelines for Resource Adequacy Planning Framework for India**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2NA==)

Guidelines
*send*
 Resource Adequacy

06 December 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2NA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**UPERC Verification of Generating Plants and Captive Consumers, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2Mw==)

Generation
*send*
 Captive Generation

06 December 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg2Mw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MNRE National Repowering Policy for Wind Power Projects, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg1OA==)

Renewable
*send*
 Wind Technology

25 November 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg1OA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Terms and Conditions for Dealing in Energy Saving Certificates) (First Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg1Nw==)

Power Markets
*send*
 ESCerts

25 November 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTg1Nw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Sharing of Inter-State Transmission Charges and Losses)
(First Amendment) Regulations, 2022[Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTYyMw==)

Transmission
*send*
 Tariff - Transmission

27 September 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTYyMw==)

\

[*link*](#)

- **Link Copied**

\
\

[**Central Electricity Authority (Flexible operation of Thermal Power Plants) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTU2Nw==)

Generation
*send*
 Engineering - Generation

01 September 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTU2Nw==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MoP’s Proposal on High Price Market Segment for Day Ahead Market (HP-DAM)**](https://cer.iitk.ac.in/blog/new_blog/?id=MTU2MA==)

Power Markets
*send*
 DAM market

31 August 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTU2MA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**The Uttar Pradesh Solar Energy Policy, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTU1OQ==)

Electricity
*send*
 Solar Policy

31 August 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTU1OQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MPERC (Power Purchase and Procurement Process) Regulations, Revision-II, 2022 (RG-19(2) of 2022) [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTU1NA==)

Regulations
*send*
 Power Procurement Planning

29 August 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTU1NA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**POSOCO (Detailed Procedure for REC Mechanism in compliance of CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022) [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTQ3MA==)

Renewable
*send*
 REC Framework

12 August 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTQ3MA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**UERC (Standards of Performance) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTQwOQ==)

Distribution
*send*
 Standard of Performance

29 July 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTQwOQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**WBERC (Open Access) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTM1OQ==)

Power Markets
*send*
 Open Access

08 July 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTM1OQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**POSOCO (Detailed Procedure for Estimation of the Requirement of SRAS & TRAS at Regional Level), 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTM1NA==)

Power Markets
*send*
 Ancillary Services

07 July 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTM1NA==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MTE1Mw==)

Consumer
*send*
 Electricity Supply Code and Related Matters

06 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTE1Mw==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzOQ==)

Renewable
*send*
 Renewable Purchase Obligation

01 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzOQ==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft GERC (Security Deposit) (Third Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzNw==)

Consumer
*send*
 Security Deposit

01 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzNw==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft GERC (Consumer Grievances Redressal Forum and Ombudsman) (First Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMw==)

Consumer
*send*
 Consumer Grievances Redressal Forum and Ombudsman

01 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMw==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft GERC (Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzNA==)

Consumer
*send*
 Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges

01 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzNA==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Guidelines for UERC (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMg==)

Transmission
*send*
 Deviation Settlement Mechanism

23 March 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMg==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC (Connectivity and General Network Access to the inter-State
Transmission System) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMQ==)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

23 March 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC: Draft Guidelines for Registration and Filing Application for Establishing and Operating Over the Counter (OTC) Platform**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMA==)

Guidelines
*send*
 Over The Counter (OTC) Platform

16 March 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTEzMA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Ministry of Power Amendments to Guidelines for short-term Procurement of Power (i.e. for a period of more than one day to one year) by Distribution Licensees through Tariff based bidding process [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0OA==)

Guidelines
*send*
 Short-term power procurement

13 January 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0OA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**TNERC (Grid connectivity and Intra-State Open Access) (Amendment) Regulations, 2014 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0MQ==)

Distribution
*send*
 Intra-State Open-Access

04 January 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0MQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**HPERC (Consumer Grievances Redressal Forum and Ombudsman) (Second Amendment) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0MA==)

Regulations
*send*
 Consumer Grievances Redressal Forum & Ombudsman

27 December 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTA0MA==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**APERC (Terms and Conditions for short-term procurement/sale of power) Regulation, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=MTAzOQ==)

Regulations
*send*
 Short - Term Power Procurement

24 December 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTAzOQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=MTAzNQ==)

Renewable
*send*
 Renewable Purchase Obligation

17 December 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTAzNQ==)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CEA Draft (Deletion and modifications of Formats for furnishing of the Statistics, Returns or Information, its time schedule and periodicity), 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=MTAyOA==)

Regulations
*send*
 Data Format

15 December 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=MTAyOA==)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters)**](https://cer.iitk.ac.in/blog/new_blog/?id=OTUy)

Transmission
*send*
 Deviation Settlement Mechanism

25 October 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=OTUy)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Ministry of Power Electricity (Rights of Consumers) Amendment Rules, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=OTQ0)

Electricity
*send*
 Rules

22 October 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=OTQ0)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**RERC (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=ODgy)

Renewable
*send*
 Renewable Purchase Obligation

24 September 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODgy)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=ODgx)

Renewable
*send*
 Green Energy Open Access

21 September 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODgx)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for determination of tariff according to Multi-Year Tariff principles and Methodology and Procedure for determination of Expected revenue from Tariff and Charges) Regulations, 2021 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=ODcy)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

07 September 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODcy)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22 and onwards till reviewed/revised by the UERC**](https://cer.iitk.ac.in/blog/new_blog/?id=ODcz)

Renewable
*send*
 Benchmark Capital Cost

01 September 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODcz)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Tamil Nadu Electricity Supply Code on stipulating harmonic limits, Methodology of measurements, meter standards, penalties etc., to ensure quality of supply to consumers [Draft Amendment]**](https://cer.iitk.ac.in/blog/new_blog/?id=ODc0)

Electricity
*send*
 Harmonics

02 August 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODc0)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Discussion Paper on Market Based Economic Dispatch (MBED)**](https://cer.iitk.ac.in/blog/new_blog/?id=ODUx)

RCP - PMEO 01 | Power Market Economics and Operation (2021)
*send*
 Market Based Economic Dispatch (MBED)

30 July 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODUx)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft CERC (Ancillary Services) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ4)

Electricity
*send*
 Ancillary Services

27 July 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ4)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Discussion paper on redesigning the Renewable Energy Certificate (REC) Mechanism**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ1)

Renewable
*send*
 REC Framework

01 July 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ1)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**HPERC (Security Deposit) (Fourth Amendment) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ0)

Electricity
*send*
 Security deposit

11 June 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQ0)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Proposed Amendments in JERC for the State of Goa & UTs (Electricity Supply Code) Regulations, 2018**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQz)

Electricity
*send*
 Supply Code

08 June 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQz)

\

[*link*](#)

- **Link Copied**

\
\

[**Proposed OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQx)

Renewable
*send*
 Renewable Purchase Obligation

01 June 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQx)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**National Electricity Policy, 2021 (Draft)**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQw)

Electricity
*send*
 Policy

21 May 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODQw)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Electricity (Rights of Consumers) (Amendment) Rules, 2021.**](https://cer.iitk.ac.in/blog/new_blog/?id=ODM5)

Electricity
*send*
 Rules

07 May 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODM5)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Implementation of Budget Initiatives for the Power and Renewable Energy Sector**](https://cer.iitk.ac.in/blog/new_blog/?id=ODM4)

Power and RE Sector
*send*
 Union Budget - 2021

27 April 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODM4)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Electricity (Change in Law, Must-run status, and other Matters) Rules, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=ODMw)

Electricity
*send*
 Rules

27 April 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODMw)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Draft Joint Electricity Regulatory Commission for the state of Goa and Union Territories (Generation, Transmission and Distribution Multi-year tariff) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=ODA2)

Distribution
*send*
 Tariff - Distribution

19 March 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODA2)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 [Proposal]**](https://cer.iitk.ac.in/blog/new_blog/?id=ODA0)

Renewable
*send*
 Tariff

15 March 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=ODA0)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Tripura Electricity Regulatory Commission (Consumer Prepaid Metering) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=Nzk0)

Distribution
*send*
 Consumer Prepaid Metering

09 March 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Nzk0)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=Nzgy)

Transmission
*send*
 State Grid Code Regulation

06 March 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=Nzgy)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=NzYz)

Renewable
*send*
 Tariff

19 February 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NzYz)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC Terms and Conditions for Tariff determination from Renewable Energy Sources (RES) Regulation, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=NTk2)

Renewable
*send*
 Tariff

27 November 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NTk2)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**Electricity Act, 2003 Amendment 2020 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=NTk3)

Electricity
*send*
 Acts

27 November 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NTk3)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MNRE: Draft Guidelines for Implementation od Off-Grid Solar Power Plants in RESCO model under MNRE Programme**](https://cer.iitk.ac.in/blog/new_blog/?id=NTk4)

Fundamentals of Renewable Energy: Economics, Policy and Regulation
*send*
 Renewable Energy Development

27 November 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NTk4)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**WBERC’s Draft for Amendment to Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations**](https://cer.iitk.ac.in/blog/new_blog/?id=NDY4)

Fundamentals of Renewable Energy: Economics, Policy and Regulation
*send*
 RE Policy and Regulation

06 July 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDY4)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CSERC Standard of Performance (SoP) in Distribution of Electricity Regulation, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=NDY2)

Distribution
*send*
 Standard of Performance

08 June 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDY2)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**MERC’s Draft for State Grid Code Regulations, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=NDYw)

Transmission
*send*
 State Grid Code Regulation

25 May 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDYw)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CERC's Proposal for Determination of Forbearance Price and Floor Price for the REC Framework**](https://cer.iitk.ac.in/blog/new_blog/?id=NDYz)

Renewable
*send*
 REC Framework

25 May 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDYz)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**HERC: Guidelines for certifying or refusing to certify non-availability to Transmission/Distribution system or Unscheduled Load Shedding**](https://cer.iitk.ac.in/blog/new_blog/?id=NDYy)

Distribution
*send*
 Open Access

25 May 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDYy)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**CEA proposes amendment to Furnishing of Statistics, Returns and Information Regulations, 2007**](https://cer.iitk.ac.in/blog/new_blog/?id=NDYx)

System Operation & Forecasting
*send*
 Data Collection

25 May 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDYx)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**POSOCO's "Draft Procedure for Collective Transactions through Real Time
Market (RTM)"**](https://cer.iitk.ac.in/blog/new_blog/?id=NDI1)

Power Markets
*send*
 Real Time Market (RTM)

12 April 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDI1)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**GERC's "Tariff Framework for Procurement of Power by Distribution
Licensees and Others from Solar Energy Projects and Other Commercial
Issues for the State of Gujarat"**](https://cer.iitk.ac.in/blog/new_blog/?id=NDI0)

Renewable
*send*
 Solar Power Procurement

07 April 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDI0)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**TNERC's "Consultative Paper for Procurement of Solar and Wind Power by
Distribution Licensee and Related Issues"**](https://cer.iitk.ac.in/blog/new_blog/?id=NDIy)

Renewable
*send*
 Renewable Power Procurement

26 March 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDIy)

\

[*link*](#)

- **Link Copied**

\
\

?>

[**APERC's "2nd Draft Amendment to Open Access Regulation"**](https://cer.iitk.ac.in/blog/new_blog/?id=NDIw)

Renewable
*send*
 Open Access and Captive Generation

23 March 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=NDIw)

\

[*link*](#)

- **Link Copied**

\
\

[**APERC's "2nd Draft Amendment to Open Access Regulation"**](https://cer.iitk.ac.in/blog/new_blog/?id=420)

Renewable
*send*
 Open Access and Captive Generation

23 March 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=420)

\

[*link*](#)

- **Link Copied**

\
\

[**TNERC's "Consultative Paper for Procurement of Solar and Wind Power by
Distribution Licensee and Related Issues"**](https://cer.iitk.ac.in/blog/new_blog/?id=422)

Renewable
*send*
 Renewable Power Procurement

26 March 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=422)

\

[*link*](#)

- **Link Copied**

\
\

[**GERC's "Tariff Framework for Procurement of Power by Distribution
Licensees and Others from Solar Energy Projects and Other Commercial
Issues for the State of Gujarat"**](https://cer.iitk.ac.in/blog/new_blog/?id=424)

Renewable
*send*
 Solar Power Procurement

07 April 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=424)

\

[*link*](#)

- **Link Copied**

\
\

[**POSOCO's "Draft Procedure for Collective Transactions through Real Time
Market (RTM)"**](https://cer.iitk.ac.in/blog/new_blog/?id=425)

Power Markets
*send*
 Real Time Market (RTM)

12 April 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=425)

\

[*link*](#)

- **Link Copied**

\
\

[**CEA proposes amendment to Furnishing of Statistics, Returns and Information Regulations, 2007**](https://cer.iitk.ac.in/blog/new_blog/?id=461)

System Operation & Forecasting
*send*
 Data Collection

25 May 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=461)

\

[*link*](#)

- **Link Copied**

\
\

[**HERC: Guidelines for certifying or refusing to certify non-availability to Transmission/Distribution system or Unscheduled Load Shedding**](https://cer.iitk.ac.in/blog/new_blog/?id=462)

Distribution
*send*
 Open Access

25 May 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=462)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC's Proposal for Determination of Forbearance Price and Floor Price for the REC Framework**](https://cer.iitk.ac.in/blog/new_blog/?id=463)

Renewable
*send*
 REC Framework

25 May 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=463)

\

[*link*](#)

- **Link Copied**

\
\

[**MERC’s Draft for State Grid Code Regulations, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=460)

Transmission
*send*
 State Grid Code Regulation

25 May 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=460)

\

[*link*](#)

- **Link Copied**

\
\

[**CSERC Standard of Performance (SoP) in Distribution of Electricity Regulation, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=466)

Distribution
*send*
 Standard of Performance

08 June 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=466)

\

[*link*](#)

- **Link Copied**

\
\

[**WBERC’s Draft for Amendment to Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations**](https://cer.iitk.ac.in/blog/new_blog/?id=468)

Fundamentals of Renewable Energy: Economics, Policy and Regulation
*send*
 RE Policy and Regulation

06 July 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=468)

\

[*link*](#)

- **Link Copied**

\
\

[**MNRE: Draft Guidelines for Implementation od Off-Grid Solar Power Plants in RESCO model under MNRE Programme**](https://cer.iitk.ac.in/blog/new_blog/?id=598)

Fundamentals of Renewable Energy: Economics, Policy and Regulation
*send*
 Renewable Energy Development

27 November 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=598)

\

[*link*](#)

- **Link Copied**

\
\

[**Electricity Act, 2003 Amendment 2020 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=597)

Electricity
*send*
 Acts

27 November 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=597)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC Terms and Conditions for Tariff determination from Renewable Energy Sources (RES) Regulation, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=596)

Renewable
*send*
 Tariff

27 November 2020

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=596)

\

[*link*](#)

- **Link Copied**

\
\

[**RERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=763)

Renewable
*send*
 Tariff

19 February 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=763)

\

[*link*](#)

- **Link Copied**

\
\

[**Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=782)

Transmission
*send*
 State Grid Code Regulation

06 March 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=782)

\

[*link*](#)

- **Link Copied**

\
\

[**Tripura Electricity Regulatory Commission (Consumer Prepaid Metering) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=794)

Distribution
*send*
 Consumer Prepaid Metering

09 March 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=794)

\

[*link*](#)

- **Link Copied**

\
\

[**Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 [Proposal]**](https://cer.iitk.ac.in/blog/new_blog/?id=804)

Renewable
*send*
 Tariff

15 March 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=804)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Joint Electricity Regulatory Commission for the state of Goa and Union Territories (Generation, Transmission and Distribution Multi-year tariff) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=806)

Distribution
*send*
 Tariff - Distribution

19 March 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=806)

\

[*link*](#)

- **Link Copied**

\
\

[**Electricity (Change in Law, Must-run status, and other Matters) Rules, 2020**](https://cer.iitk.ac.in/blog/new_blog/?id=830)

Electricity
*send*
 Rules

27 April 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=830)

\

[*link*](#)

- **Link Copied**

\
\

[**Implementation of Budget Initiatives for the Power and Renewable Energy Sector**](https://cer.iitk.ac.in/blog/new_blog/?id=838)

Power and RE Sector
*send*
 Union Budget - 2021

27 April 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=838)

\

[*link*](#)

- **Link Copied**

\
\

[**Electricity (Rights of Consumers) (Amendment) Rules, 2021.**](https://cer.iitk.ac.in/blog/new_blog/?id=839)

Electricity
*send*
 Rules

07 May 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=839)

\

[*link*](#)

- **Link Copied**

\
\

[**National Electricity Policy, 2021 (Draft)**](https://cer.iitk.ac.in/blog/new_blog/?id=840)

Electricity
*send*
 Policy

21 May 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=840)

\

[*link*](#)

- **Link Copied**

\
\

[**Proposed OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=841)

Renewable
*send*
 Renewable Purchase Obligation

01 June 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=841)

\

[*link*](#)

- **Link Copied**

\
\

[**Proposed Amendments in JERC for the State of Goa & UTs (Electricity Supply Code) Regulations, 2018**](https://cer.iitk.ac.in/blog/new_blog/?id=843)

Electricity
*send*
 Supply Code

08 June 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=843)

\

[*link*](#)

- **Link Copied**

\
\

[**HPERC (Security Deposit) (Fourth Amendment) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=844)

Electricity
*send*
 Security deposit

11 June 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=844)

\

[*link*](#)

- **Link Copied**

\
\

[**Discussion paper on redesigning the Renewable Energy Certificate (REC) Mechanism**](https://cer.iitk.ac.in/blog/new_blog/?id=845)

Renewable
*send*
 REC Framework

01 July 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=845)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft CERC (Ancillary Services) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=848)

Electricity
*send*
 Ancillary Services

27 July 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=848)

\

[*link*](#)

- **Link Copied**

\
\

[**Discussion Paper on Market Based Economic Dispatch (MBED)**](https://cer.iitk.ac.in/blog/new_blog/?id=851)

RCP - PMEO 01 | Power Market Economics and Operation (2021)
*send*
 Market Based Economic Dispatch (MBED)

30 July 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=851)

\

[*link*](#)

- **Link Copied**

\
\

[**Tamil Nadu Electricity Supply Code on stipulating harmonic limits, Methodology of measurements, meter standards, penalties etc., to ensure quality of supply to consumers [Draft Amendment]**](https://cer.iitk.ac.in/blog/new_blog/?id=874)

Electricity
*send*
 Harmonics

02 August 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=874)

\

[*link*](#)

- **Link Copied**

\
\

[**Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22 and onwards till reviewed/revised by the UERC**](https://cer.iitk.ac.in/blog/new_blog/?id=873)

Renewable
*send*
 Benchmark Capital Cost

01 September 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=873)

\

[*link*](#)

- **Link Copied**

\
\

[**Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for determination of tariff according to Multi-Year Tariff principles and Methodology and Procedure for determination of Expected revenue from Tariff and Charges) Regulations, 2021 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=872)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

07 September 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=872)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=881)

Renewable
*send*
 Green Energy Open Access

21 September 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=881)

\

[*link*](#)

- **Link Copied**

\
\

[**RERC (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=882)

Renewable
*send*
 Renewable Purchase Obligation

24 September 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=882)

\

[*link*](#)

- **Link Copied**

\
\

[**Ministry of Power Electricity (Rights of Consumers) Amendment Rules, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=944)

Electricity
*send*
 Rules

22 October 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=944)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters)**](https://cer.iitk.ac.in/blog/new_blog/?id=952)

Transmission
*send*
 Deviation Settlement Mechanism

25 October 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=952)

\

[*link*](#)

- **Link Copied**

\
\

[**CEA Draft (Deletion and modifications of Formats for furnishing of the Statistics, Returns or Information, its time schedule and periodicity), 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=1028)

Regulations
*send*
 Data Format

15 December 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1028)

\

[*link*](#)

- **Link Copied**

\
\

[**OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1035)

Renewable
*send*
 Renewable Purchase Obligation

17 December 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1035)

\

[*link*](#)

- **Link Copied**

\
\

[**APERC (Terms and Conditions for short-term procurement/sale of power) Regulation, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=1039)

Regulations
*send*
 Short - Term Power Procurement

24 December 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1039)

\

[*link*](#)

- **Link Copied**

\
\

[**HPERC (Consumer Grievances Redressal Forum and Ombudsman) (Second Amendment) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=1040)

Regulations
*send*
 Consumer Grievances Redressal Forum & Ombudsman

27 December 2021

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1040)

\

[*link*](#)

- **Link Copied**

\
\

[**TNERC (Grid connectivity and Intra-State Open Access) (Amendment) Regulations, 2014 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1041)

Distribution
*send*
 Intra-State Open-Access

04 January 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1041)

\

[*link*](#)

- **Link Copied**

\
\

[**Ministry of Power Amendments to Guidelines for short-term Procurement of Power (i.e. for a period of more than one day to one year) by Distribution Licensees through Tariff based bidding process [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1048)

Guidelines
*send*
 Short-term power procurement

13 January 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1048)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC: Draft Guidelines for Registration and Filing Application for Establishing and Operating Over the Counter (OTC) Platform**](https://cer.iitk.ac.in/blog/new_blog/?id=1130)

Guidelines
*send*
 Over The Counter (OTC) Platform

16 March 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1130)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Connectivity and General Network Access to the inter-State
Transmission System) Regulations, 2021**](https://cer.iitk.ac.in/blog/new_blog/?id=1131)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

23 March 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1131)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Guidelines for UERC (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=1132)

Transmission
*send*
 Deviation Settlement Mechanism

23 March 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1132)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft GERC (Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=1134)

Consumer
*send*
 Licensee’s Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges

01 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1134)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft GERC (Consumer Grievances Redressal Forum and Ombudsman) (First Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=1133)

Consumer
*send*
 Consumer Grievances Redressal Forum and Ombudsman

01 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1133)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft GERC (Security Deposit) (Third Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=1137)

Consumer
*send*
 Security Deposit

01 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1137)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=1139)

Renewable
*send*
 Renewable Purchase Obligation

01 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1139)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=1153)

Consumer
*send*
 Electricity Supply Code and Related Matters

06 April 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1153)

\

[*link*](#)

- **Link Copied**

\
\

[**POSOCO (Detailed Procedure for Estimation of the Requirement of SRAS & TRAS at Regional Level), 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1354)

Power Markets
*send*
 Ancillary Services

07 July 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1354)

\

[*link*](#)

- **Link Copied**

\
\

[**WBERC (Open Access) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1359)

Power Markets
*send*
 Open Access

08 July 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1359)

\

[*link*](#)

- **Link Copied**

\
\

[**UERC (Standards of Performance) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1409)

Distribution
*send*
 Standard of Performance

29 July 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1409)

\

[*link*](#)

- **Link Copied**

\
\

[**POSOCO (Detailed Procedure for REC Mechanism in compliance of CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022) [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1470)

Renewable
*send*
 REC Framework

12 August 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1470)

\

[*link*](#)

- **Link Copied**

\
\

[**MPERC (Power Purchase and Procurement Process) Regulations, Revision-II, 2022 (RG-19(2) of 2022) [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1554)

Regulations
*send*
 Power Procurement Planning

29 August 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1554)

\

[*link*](#)

- **Link Copied**

\
\

[**The Uttar Pradesh Solar Energy Policy, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1559)

Electricity
*send*
 Solar Policy

31 August 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1559)

\

[*link*](#)

- **Link Copied**

\
\

[**MoP’s Proposal on High Price Market Segment for Day Ahead Market (HP-DAM)**](https://cer.iitk.ac.in/blog/new_blog/?id=1560)

Power Markets
*send*
 DAM market

31 August 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1560)

\

[*link*](#)

- **Link Copied**

\
\

[**Central Electricity Authority (Flexible operation of Thermal Power Plants) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1567)

Generation
*send*
 Engineering - Generation

01 September 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1567)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Sharing of Inter-State Transmission Charges and Losses)
(First Amendment) Regulations, 2022[Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1623)

Transmission
*send*
 Tariff - Transmission

27 September 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1623)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Terms and Conditions for Dealing in Energy Saving Certificates) (First Amendment) Regulations, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=1857)

Power Markets
*send*
 ESCerts

25 November 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1857)

\

[*link*](#)

- **Link Copied**

\
\

[**MNRE National Repowering Policy for Wind Power Projects, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1858)

Renewable
*send*
 Wind Technology

25 November 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1858)

\

[*link*](#)

- **Link Copied**

\
\

[**UPERC Verification of Generating Plants and Captive Consumers, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1863)

Generation
*send*
 Captive Generation

06 December 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1863)

\

[*link*](#)

- **Link Copied**

\
\

[**CEA: Draft Guidelines for Resource Adequacy Planning Framework for India**](https://cer.iitk.ac.in/blog/new_blog/?id=1864)

Guidelines
*send*
 Resource Adequacy

06 December 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1864)

\

[*link*](#)

- **Link Copied**

\
\

[**Policy paper for Indian Carbon Market, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1865)

Policy
*send*
 Carbon Market

12 December 2022

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1865)

\

[*link*](#)

- **Link Copied**

\
\

[**Electricity (Amendment), Bill**](https://cer.iitk.ac.in/blog/new_blog/?id=1921)

Electricity
*send*
 Acts

27 January 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1921)

\

[*link*](#)

- **Link Copied**

\
\

[**MoP: Concept Note on Pooling of Tariff of 25 years Plus Thermal/Gas Generating Stations**](https://cer.iitk.ac.in/blog/new_blog/?id=1930)

Guidelines
*send*
 Pooling

30 January 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1930)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC: Staff Paper on Power Market**](https://cer.iitk.ac.in/blog/new_blog/?id=1931)

Regulations
*send*
 Staff Paper on Power Market

30 January 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1931)

\

[*link*](#)

- **Link Copied**

\
\

[**PSERC (Terms and Conditions for determination of Generation, Transmission Wheeling and Retail Supply Tariff)(1st Amendment) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1965)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

10 February 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1965)

\

[*link*](#)

- **Link Copied**

\
\

[**UPERC (Modalities of Tariff Determination) Regulations, 2022 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=1966)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

10 February 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1966)

\

[*link*](#)

- **Link Copied**

\
\

[**Central Electricity Regulatory Commission (Staff Paper on Power Market Pricing), October 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=1985)

Power Markets
*send*
 Power Market Design

17 February 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1985)

\

[*link*](#)

- **Link Copied**

\
\

[**Notification of Renewable Generation Obligation as per Revised Tariff Policy 2016**](https://cer.iitk.ac.in/blog/new_blog/?id=1986)

Generation
*send*
 Renewable

17 February 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=1986)

\

[*link*](#)

- **Link Copied**

\
\

[**JSERC (Modalities of Tariff Determination) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2097)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

17 March 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2097)

\

[*link*](#)

- **Link Copied**

\
\

[**MoP (Draft Proposal on Day Ahead Operation of Security Constrained Economic Dispatch) 2023, [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2098)

Power Markets
*send*
 DA-SCED

21 March 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2098)

\

[*link*](#)

- **Link Copied**

\
\

[**POSOCO: Draft Detailed Procedure for Tertiary Reserve Ancillary Service (TRAS)**](https://cer.iitk.ac.in/blog/new_blog/?id=2099)

Procedure
*send*
 TRAS

10 April 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2099)

\

[*link*](#)

- **Link Copied**

\
\

[**HERC Draft Notification on “Green Energy Open Access Regulation 2023"**](https://cer.iitk.ac.in/blog/new_blog/?id=2117)

Open Access
*send*
 Green Open Access

02 May 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2117)

\

[*link*](#)

- **Link Copied**

\
\

[**Ministry of Power (Draft guidelines to promote development of Pump Storage Projects in the country)**](https://cer.iitk.ac.in/blog/new_blog/?id=2124)

Renewable
*send*
 Hydro Pumped Storage

03 May 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2124)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2127)

Transmission
*send*
 Tariff - Transmission

24 May 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2127)

\

[*link*](#)

- **Link Copied**

\
\

[**MoP’s Proposal on Draft Electricity (Amendment) Rules, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=2253)

Electricity
*send*
 Rules

16 June 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2253)

\

[*link*](#)

- **Link Copied**

\
\

[**RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2254)

Electricity
*send*
 Renewable Energy

16 June 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2254)

\

[*link*](#)

- **Link Copied**

\
\

[**MPERC (Draft guidelines for Approach Paper on “Methodology for Estimation of Electricity generated from Biomass in Biomass co-fired thermal power plants”)**](https://cer.iitk.ac.in/blog/new_blog/?id=2268)

Generation
*send*
 Renewable - Thermal

28 June 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2268)

\

[*link*](#)

- **Link Copied**

\
\

[**CEA: Draft Guidelines for Medium and Long Term Power Demand Forecast**](https://cer.iitk.ac.in/blog/new_blog/?id=2273)

Guidelines
*send*
 Forecasting

14 July 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2273)

\

[*link*](#)

- **Link Copied**

\
\

[**HERC Draft Notification on "Duty to Supply Electricity on Request and Power to Recover
Expenditure and Power to Require Security Regulations 2016 (3rd Amendment)
Regulation, 2023".**](https://cer.iitk.ac.in/blog/new_blog/?id=2274)

Single Point Supply
*send*
 Duty to supply Electricity

02 August 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2274)

\

[*link*](#)

- **Link Copied**

\
\

[**CEA: Guidelines for RA Planning Framework for India, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=2275)

Guidelines
*send*
 Resource Adequacy

07 August 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2275)

\

[*link*](#)

- **Link Copied**

\
\

[**DERC (Net Metering for Renewable Energy) (First Amendment) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2284)

Electricity
*send*
 Renewable Energy

13 September 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2284)

\

[*link*](#)

- **Link Copied**

\
\

[**UERC (Terms and Conditions for Determination of Multi Year Tariff) (2nd Amd) Regulations, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=2285)

Electricity
*send*
 FPPCA

13 September 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2285)

\

[*link*](#)

- **Link Copied**

\
\

[**Grid India (Detailed Procedures for Security Constrained Unit Commitment (SCUC), Unit Shut Down (USD), and Security Constrained Economic Despatch (SCED) at Regional Level), 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2302)

Power Markets
*send*
 SCED - Power Market

26 October 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2302)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC Staff Paper on Market Coupling**](https://cer.iitk.ac.in/blog/new_blog/?id=2303)

Power Markets
*send*
 Market Coupling

30 October 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2303)

\

[*link*](#)

- **Link Copied**

\
\

[**BRPL Letter dt. 17th April, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=2304)

Rooftop Solar
*send*
 Renewable Purchase Obligation

07 November 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2304)

\

[*link*](#)

- **Link Copied**

\
\

[**Approach Paper On Terms and Conditions of Tariff Regulations**](https://cer.iitk.ac.in/blog/new_blog/?id=2305)

Regulations
*send*
 Tariff - Generation, Distribution, Transmission

17 November 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2305)

\

[*link*](#)

- **Link Copied**

\
\

[**Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2023 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2307)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

01 December 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2307)

\

[*link*](#)

- **Link Copied**

\
\

[**Detailed Procedure for Compliance Mechanism under the Indian Carbon Market, 2023 [draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2308)

Indian Carbon Market (ICM)
*send*
 Carbon Credit Trading Scheme

22 December 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2308)

\

[*link*](#)

- **Link Copied**

\
\

[**Procedure, Terms and Conditions for grant of Transmission Licence and other related matters, Regulations, 2023**](https://cer.iitk.ac.in/blog/new_blog/?id=2309)

Transmission
*send*
 Transmission licence

22 December 2023

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2309)

\

[*link*](#)

- **Link Copied**

\
\

[**CEA: Proposed procedure for verification of captive status of such generating plants, where captive generating plant and its captive user(s) are located in more than one state [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2319)

Generation
*send*
 Captive Generating Plant

31 January 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2319)

\

[*link*](#)

- **Link Copied**

\
\

[**JSERC (Terms and Conditions for Green Energy Open-access) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=2391)

Generation
*send*
 Green Energy

05 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2391)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=2392)

Transmission
*send*
 Inter-State Transmission

18 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2392)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC: Commission (Terms and Conditions of Tariff) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2393)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

23 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2393)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=2395)

Renewable
*send*
 Tariff

25 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2395)

\

[*link*](#)

- **Link Copied**

\
\

[**APSERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2396)

Guidelines
*send*
 Resource Adequacy

25 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2396)

\

[*link*](#)

- **Link Copied**

\
\

[**APSERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=2394)

Renewable Energy
*send*
 Generation

26 April 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2394)

\

[*link*](#)

- **Link Copied**

\
\

[**Revised Draft on KERC (Verification of captive status of generating plants/consumers in the State of Karnataka) Regulation, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=2426)

Generation
*send*
 Captive Generating Plant

20 May 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2426)

\

[*link*](#)

- **Link Copied**

\
\

[**MNRE (Draft Guidelines for implementation of PM-Surya Ghar: Muft Bijli Yojana for component to "CFA to Residential Sector"), 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=2427)

Renewable Energy
*send*
 Rooftop Solar Generation

22 May 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2427)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Deviation Settlement and Related Matters) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2556)

Transmission
*send*
 Deviation Settlement Mechanism

29 July 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2556)

\

[*link*](#)

- **Link Copied**

\
\

[**UERC "Tariff and Others Terms for Supply of Electricity from
Renewable Energy Sources and non-fossil fuel based Co-generating Stations" (First Amendment) Regulations, 2024.
[Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2557)

Renewable
*send*
 Renewable Purchase Obligation

29 July 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2557)

\

[*link*](#)

- **Link Copied**

\
\

[**UERC Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2558)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

13 August 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2558)

\

[*link*](#)

- **Link Copied**

\
\

[**TNERC: TNERC (Framework for Resource Adequacy) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2559)

Guidelines
*send*
 Resource Adequacy

13 August 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2559)

\

[*link*](#)

- **Link Copied**

\
\

[**DERC (Renewable Purchase Obligation and RE Certificate Framework Implementation) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=2562)

Green Energy
*send*
 Renewable Purchase Obligation & REC

29 August 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2562)

\

[*link*](#)

- **Link Copied**

\
\

[**DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024. [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2563)

Renewable
*send*
 Open Access and Captive Generation

05 September 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2563)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC: Staff Paper on Regulatory Oversight on Bidding Behaviour in Power Exchanges**](https://cer.iitk.ac.in/blog/new_blog/?id=2564)

Staff Paper
*send*
 Market Monitoring

06 September 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2564)

\

[*link*](#)

- **Link Copied**

\
\

[**MPERC "Ancillary Services" Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2565)

Electricity
*send*
 Ancillary Services

19 September 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2565)

\

[*link*](#)

- **Link Copied**

\
\

[**OERC - Regulation on Framework for Resource Adequacy [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2577)

Guidelines
*send*
 Resource Adequacy

07 October 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2577)

\

[*link*](#)

- **Link Copied**

\
\

[**OERC - Regulation on Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024
[Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2578)

Renewable
*send*
 Procurement of Energy from Renewable Sources

07 October 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2578)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2024. [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2581)

Amendment
*send*
 Terms and Conditions of Tariff

08 November 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2581)

\

[*link*](#)

- **Link Copied**

\
\

[**MoP (Tariff based competitive bidding guidelines for procurement of storage capacity/stored energy from Pumped Storage Plants), 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2582)

Renewable
*send*
 Hydro Pumped Storage

11 November 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2582)

\

[*link*](#)

- **Link Copied**

\
\

[**AERC (Demand Response) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2606)

Demand Response
*send*
 Demand Response

04 December 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2606)

\

[*link*](#)

- **Link Copied**

\
\

[**Terms and Conditions for Determination of Generation Tariff Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2634)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

10 December 2024

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2634)

\

[*link*](#)

- **Link Copied**

\
\

[**CEA Draft discussion paper on “Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under Resource Adequacy Framework”**](https://cer.iitk.ac.in/blog/new_blog/?id=2701)

Discussion Paper
*send*
 Coincident Peak, Capacity Credit, Recourse Adequacy

07 January 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2701)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Terms and Conditions for Purchase and Sale of Carbon Credit Certificates) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2702)

Indian Carbon Market (ICM)
*send*
 Carbon Credit Certificate

08 January 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2702)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Regulation on Framework for Resource Adequacy**](https://cer.iitk.ac.in/blog/new_blog/?id=2703)

Resource Adequacy
*send*
 Resource Adequacy

04 February 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2703)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft Procedure for Mechanism of Compensation for Degradation of Heat Rate, Auxiliary Consumption, and Secondary Fuel Oil Consumption Due to Part Load Operation and Multiple Start/Stop of Units**](https://cer.iitk.ac.in/blog/new_blog/?id=2704)

Part Load Operation
*send*
 Compensation

04 February 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2704)

\

[*link*](#)

- **Link Copied**

\
\

[**UPERC “MYT for Distribution and Transmission Tariff” (Third Amendment) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2705)

Tariff Determination (MYT)
*send*
 Tariff- Generation, Transmission, SLDC, Distribution

04 February 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2705)

\

[*link*](#)

- **Link Copied**

\
\

[**RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2709)

Renewable
*send*
 Open Access and Captive Generation

04 March 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2709)

\

[*link*](#)

- **Link Copied**

\
\

[**Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022**](https://cer.iitk.ac.in/blog/new_blog/?id=2711)

Electricity
*send*
 FPPCA

11 April 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2711)

\

[*link*](#)

- **Link Copied**

\
\

[**HERC (Green Energy Open Access) Regulations, 2023 1st Amendment Regulations, 2025 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2712)

Green Energy
*send*
 Open Access

11 April 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2712)

\

[*link*](#)

- **Link Copied**

\
\

[**BERC (Renewable Purchase Obligation, its compliance and REC Framework Implementation) Regulations**](https://cer.iitk.ac.in/blog/new_blog/?id=2734)

Green Energy
*send*
 Renewable Purchase Obligation & REC

22 April 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2734)

\

[*link*](#)

- **Link Copied**

\
\

[**Gazette Notification on Renewable Consumption Obligation (RCO) notified on 20th Oct 2023, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=2735)

Green Energy
*send*
 Renewable Purchase Obligation & REC

02 May 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2735)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC: Indian Energy Exchange petition before Commission on introduction of Green Real Time Market segment on its trading platform**](https://cer.iitk.ac.in/blog/new_blog/?id=2736)

Power Markets
*send*
 Power Market Design

14 May 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2736)

\

[*link*](#)

- **Link Copied**

\
\

[**TNERC (Renewable Energy Purchase Obligation) (Amendment) Regulation, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=2747)

Green Energy
*send*
 Renewable Purchase Obligation & REC

11 June 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2747)

\

[*link*](#)

- **Link Copied**

\
\

[**Draft amendments proposed in the MBDs for Procurement of Power for Long term from Thermal Power Stations set up on DBFOO basis -Reg.**](https://cer.iitk.ac.in/blog/new_blog/?id=2750)

Generation
*send*
 Thermal Power Plant

11 June 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2750)

\

[*link*](#)

- **Link Copied**

\
\

[**Ministry of Coal (Public Consultation on Coal Trade Exchange)**](https://cer.iitk.ac.in/blog/new_blog/?id=2751)

Market
*send*
 Coal Trade Exchange

11 June 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2751)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Virtual Power Purchase Agreements (VPPAs)) Guidelines, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=2764)

Power Markets
*send*
 Renewable Energy Contracts

10 July 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2764)

\

[*link*](#)

- **Link Copied**

\
\

[**Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Project, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=2765)

Renewable Energy
*send*
 Procurements

16 July 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2765)

\

[*link*](#)

- **Link Copied**

\
\

[**KSERC (Renewable Energy and Related Matters) Regulations 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=2767)

Renewable Energy
*send*
 Tariff, RPO

06 August 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2767)

\

[*link*](#)

- **Link Copied**

\
\

[**CEA: “Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022.”**](https://cer.iitk.ac.in/blog/new_blog/?id=2766)

Electricity
*send*
 FPPCA

06 August 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2766)

\

[*link*](#)

- **Link Copied**

\
\

[**Energy Conservation (Compliance Enforcement) Rules, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=2768)

Renewable Energy
*send*
 Compliance

28 August 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2768)

\

[*link*](#)

- **Link Copied**

\
\

[**Renewable Consumption Obligation (RCO) Under the Energy Conservation Act, 2001**](https://cer.iitk.ac.in/blog/new_blog/?id=2769)

Renewable Energy
*send*
 RCO / RPO

28 August 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2769)

\

[*link*](#)

- **Link Copied**

\
\

[**IEX Petition (Introduction of the Peak Day Ahead Market (Peak DAM) and Peak Real Time Market (Peak RTM) at Indian Energy Exchange Limited**](https://cer.iitk.ac.in/blog/new_blog/?id=2796)

*send*

16 September 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2796)

\

[*link*](#)

- **Link Copied**

\
\

[**HPERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2799)

Transmission
*send*
 Deviation Settlement Mechanism

15 October 2025

[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2799)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC (Power Market) (First Amendment) Regulations, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=2800)

Power Markets
*send*
 Power Market Design

10 March 2026

The CERC notified draft on CERC (Power Market) (First Amendment) Regulations, 2025, issued on 17th June 2025. The main objectives of the proposed regulations are:Objective: The CERC seeks to strengthen the evolving framework of electricity trading by expanding role of Over-the-Counter (OTC) platforms and incorporating Virtual Power Purchase Agreements (VPPAs). The amendment aims to promote innovation in market instruments, and provide flexibility for buyers and sellers through structured
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2800)

\

[*link*](#)

- **Link Copied**

\
\

[**MoP Draft Electricity (Amendment) Bill, 2025**](https://cer.iitk.ac.in/blog/new_blog/?id=2852)

Electricity
*send*
 Amendment Act

29 January 2026

The MoP notified the draft on Electricity (Amendment) Bill, 2025, issued on 9th October, 2025.The key objectives of the draft are mentioned below:Objective: The Draft Electricity (Amendment) Bill, 2025 aims to strengthen India's power sector so it can deliver affordable, reliable, and clean electricity for all, while supporting the country's transition toward a sustainable and competitive economy. The amendments seek to ensure the financial health of distribution companies
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2852)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC Petition on (Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO))**](https://cer.iitk.ac.in/blog/new_blog/?id=2851)

Green Energy
*send*
 Renewable Consumption Obligation

29 January 2026

The CERC invited comments, suggestions and objections on discussion paper Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO), issued on 5th December, 2025. The key objectives are:Objective: The objective is to determine a buyout price as an alternate compliance mechanism for meeting Renewable Consumption Obligation (RCO) in line with the Ministry of Power’s notification. It links the buyout price to
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2851)

\

[*link*](#)

- **Link Copied**

\
\

[**Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) contracts**](https://cer.iitk.ac.in/blog/new_blog/?id=2853)

Power Markets
*send*
 Green RTM and High Price RTM

29 January 2026

The Hindustan Power Exchange (HPX) Limited, filed petition to the CERC on Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) Contracts, on 12th December, 2025. The main objectives of the petition are:Objective: The petition aims to introduce Green Real Time Market (G-RTM) and High Price Real Time Market (HP-RTM) contracts on the HPX platform to enhance market depth, flexibility, and price discovery in the real-time segment.
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2853)

\

[*link*](#)

- **Link Copied**

\
\

[**CERC Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First A**](https://cer.iitk.ac.in/blog/new_blog/?id=2854)

Renewable
*send*
 REC Framework

29 January 2026

The CERC notified draft on Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First Amendment) Regulations, issued on 22nd September, 2025. The main objectives of the proposed regulations are:Objective: The draft regulation aims to align the Renewable Energy Certificate (REC) framework with the Renewable Consumption Obligation (RCO) regime under the Energy Conservation Act, 2001, and strengthen RECs as a credible compliance instrument. It expands the
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2854)

\

[*link*](#)

- **Link Copied**

\
\

[**Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024**](https://cer.iitk.ac.in/blog/new_blog/?id=2855)

Transmission
*send*
 Deviation Settlement Mechanism

29 January 2026

The CERC issued discussion paper on “Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 1st April, 2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024”, issued on 10th September, 2025. The main objectives of the proposed in the discussion paper are:Objective: The draft proposal aims to determine
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2855)

\

[*link*](#)

- **Link Copied**

\
\

[**RERC (Battery Energy Storage Systems), 2025 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2856)

Renewable
*send*
 Energy Storage Systems

29 January 2026

The RERC notified draft on Battery Energy Storage Systems Regulations, 2025. The main objectives of the proposed regulations are:Objective: The regulations aim to enable the deployment and utilization of Battery Energy Storage Systems (BESS) as integral components of generation, transmission, and distribution infrastructure, while facilitating their participation in ancillary services and energy markets. They seek to promote cost-effective energy storage solutions that enhance grid stability, support frequency regulation,
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2856)

\

[*link*](#)

- **Link Copied**

\
\

[**RERC (Compensation for part load operation for the generating stations below the normative level of operation), 2025 [Draft]**](https://cer.iitk.ac.in/blog/new_blog/?id=2857)

Part Load Operation
*send*
 Compensation

29 January 2026

The RERC notified the draft on Compensation for Part Load Operation for the Generating Stations below the Normative Level of Operation, 2025, issued on December, 2025. The main objectives of the proposed draft are:Objective: The draft order establishes a clear and transparent regulation for compensating thermal generating stations that are required to operate below the normative level of operation. In accordance with Regulation 51 of the RERC (Rajasthan
[**...read more**](https://cer.iitk.ac.in/blog/new_blog/?id=2857)

\

[*link*](#)

- **Link Copied**

###### Recent Discussions

###### Related Blogs

- [CERC (Power Market) (First Amendment) Regulations, 2025](javascript:;)
   
  10 March 2026 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [RERC (Compensation for part load operation for the generating stations below the normative level of operation), 2025 [Draft]](javascript:;)
   
  29 January 2026 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [RERC (Battery Energy Storage Systems), 2025 [Draft]](javascript:;)
   
  29 January 2026 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards under the provisions of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024](javascript:;)
   
  29 January 2026 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [CERC Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation (First A](javascript:;)
   
  29 January 2026 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [Introduction of Green RTM (G-RTM) and High Price RTM (HP-RTM) contracts](javascript:;)
   
  29 January 2026 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [CERC Petition on (Determination of the Buyout Price as an alternate compliance mechanism towards fulfilment of Renewable Consumption Obligation (RCO))](javascript:;)
   
  29 January 2026 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [MoP Draft Electricity (Amendment) Bill, 2025](javascript:;)
   
  29 January 2026 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [HPERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025 [Draft]](javascript:;)
   
  15 October 2025 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [Renewable Consumption Obligation (RCO) Under the Energy Conservation Act, 2001](javascript:;)
   
  28 August 2025 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [Energy Conservation (Compliance Enforcement) Rules, 2025](javascript:;)
   
  28 August 2025 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [CEA: “Alternative Mechanism for implementation of FPPAS under of the Electricity (Amendment) Rules, 2022.”](javascript:;)
   
  06 August 2025 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [KSERC (Renewable Energy and Related Matters) Regulations 2025](javascript:;)
   
  06 August 2025 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Project, 2025](javascript:;)
   
  16 July 2025 
  \
  Total Posts: 1      Post By: 
  CER TEAM
- [CERC (Virtual Power Purchase Agreements (VPPAs)) Guidelines, 2025](javascript:;)
   
  10 July 2025 
  \
  Total Posts: 1      Post By: 
  CER TEAM